Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
70
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0960 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,810 | $1,850 | Implemented |
GT0960 # 02 Y:2021 | 02 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,573 | $800 | Implemented |
GT0960 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,666 | $8,719 | Implemented |
UF0576 # 02 Y:2022 | 02 | 2022 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $30,987 | $10,183 | Implemented |
UF0576 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $55,456 | $51,203 | Implemented |
UF0576 # 12 Y:2022 | 12 | 2022 | IMPROVE SPACE COMFORT CONDITIONING | $19,893 | $5,851 | Implemented |
UF0576 # 11 Y:2022 | 11 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $284,508 | $0 | Implemented |
UF0576 # 10 Y:2022 | 10 | 2022 | INCREASE AMOUNT OF CONDENSATE RETURNED | $1,400 | $1,449 | Implemented |
UF0576 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,147 | $0 | Implemented |
UF0576 # 07 Y:2022 | 07 | 2022 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,306 | $765 | Implemented |
UF0576 # 09 Y:2022 | 09 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,828 | $2,002 | Implemented |
UF0576 # 05 Y:2022 | 05 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $16,965 | $25,427 | Implemented |
UF0576 # 04 Y:2022 | 04 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $21,495 | $6,314 | Implemented |
UF0576 # 03 Y:2022 | 03 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,479 | $16,283 | Implemented |
GT0930 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,041 | $3,500 | Implemented |
GT0930 # 07 Y:2019 | 07 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,081 | $2,100 | Implemented |
GT0930 # 05 Y:2019 | 05 | 2019 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,746 | $1,755 | Implemented |
GT0930 # 04 Y:2019 | 04 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $479 | $463 | Implemented |
GT0930 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,531 | $8,066 | Implemented |
GT0930 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,062 | $3,500 | Implemented |
GT0930 # 01 Y:2019 | 01 | 2019 | INSTALL OCCUPANCY SENSORS | $11,220 | $2,763 | Implemented |
GT0929 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,816 | $32,516 | Implemented |
GT0908 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $44,491 | $135,000 | Implemented |
GT0908 # 05 Y:2017 | 05 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,538 | $61,313 | Implemented |
GT0908 # 02 Y:2017 | 02 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,577 | $578 | Implemented |