IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0520 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,247 $4,450 Implemented
DL0187 # 02 Y:2021 02 2021 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $13,620 $0 Implemented
DL0187 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,940 $5,000 Implemented
DL0187 # 10 Y:2021 10 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,153 $1,574 Implemented
DL0187 # 01 Y:2021 01 2021 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,390 $0 Implemented
WV0602 # 10 Y:2020 10 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $136 $570 Implemented
WV0602 # 09 Y:2020 09 2020 DEVELOP A REPAIR/REPLACE POLICY $154 $568 Implemented
WV0602 # 08 Y:2020 08 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $263 $1,060 Implemented
WV0602 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $268 $1,225 Implemented
WV0602 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $1,512 $2,197 Implemented
WV0602 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $1,669 $2,886 Implemented
WV0602 # 01 Y:2020 01 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,049 $3,000 Implemented
LE0348 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,956 $5,700 Implemented
LE0348 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,650 $1,600 Implemented
LE0348 # 05 Y:2012 05 2012 REPAIR AND ELIMINATE STEAM LEAKS $2,368 $2,300 Implemented
LE0348 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,702 $24,000 Implemented
WV0200 # 05 Y:2000 05 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,070 $1,012 Implemented
WV0200 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $3,609 $636 Implemented
WV0200 # 09 Y:2000 09 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $34,531 $0 Implemented
WV0200 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $471 $500 Implemented
WV0200 # 03 Y:2000 03 2000 USE SYNTHETIC LUBRICANT $1,587 $727 Implemented
WV0200 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,112 $25 Implemented