IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,008

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0224 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,460 $1,382 Implemented
TR0042 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $141 $52 Implemented
TR0042 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $33,568 $395,038 Not Implemented
TR0042 # 03 Y:2022 03 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $18,544 $6,243 Implemented
UL2303 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $43,641 $26,163 Not Implemented
UL2303 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,504 $0 Not Implemented
UL2303 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,439 $34,126 Not Implemented
UL2303 # 04 Y:2023 04 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,140 $7,650 Not Implemented
UL2303 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $36,831 $336,395 Not Implemented
UL2303 # 06 Y:2023 06 2023 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $7,161 $21,450 Not Implemented
UL2303 # 07 Y:2023 07 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $6,194 $25,900 Not Implemented
LT8373 # 01 Y:2023 01 2023 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $98,547 $220,400 n/a
LT8373 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,015 $37,491 n/a
LT8373 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,033 $14,614 n/a
LT8373 # 04 Y:2023 04 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $96,000 $0 n/a
LT8373 # 05 Y:2023 05 2023 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $24,164 $0 n/a
LT8373 # 06 Y:2023 06 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $22,998 $53,560 n/a
LT8373 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,264 $99,888 n/a
MU0025 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,630 $360 Implemented
MU0025 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,096 $0 Implemented
MU0025 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $37 $50 Implemented
MU0025 # 04 Y:2023 04 2023 KEEP EQUIPMENT CLEAN $332 $0 Implemented
MU0025 # 05 Y:2023 05 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $382 $690 Not Implemented
MU0025 # 06 Y:2023 06 2023 USE OPTIMUM TEMPERATURE $1,361 $0 Implemented
MU0025 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,434 $2,876 Implemented