IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,008

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0025 # 08 Y:2023 08 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $431 $0 Implemented
MU0025 # 09 Y:2023 09 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,952 $19,852 Implemented
MU0025 # 10 Y:2023 10 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,348 $9,576 Not Implemented
NT0005 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,885 $1,258 Not Implemented
NT0005 # 02 Y:2023 02 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $6,240 $0 Not Implemented
NT0005 # 03 Y:2023 03 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $832,000 $100,000 Not Implemented
NT0005 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,375 $6,539 Not Implemented
NT0005 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $4,433 $9,008 Not Implemented
NT0005 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,810 $0 Not Implemented
MI0415 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $10,535 $3,084 Not Implemented
MI0415 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,767 $960 Implemented
MI0415 # 03 Y:2022 03 2022 REPLACE BOILER $73,846 $170,000 Not Implemented
MI0415 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,830 $7,950 Not Implemented
MI0415 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $142,120 $2,400 Not Implemented
MI0415 # 06 Y:2022 06 2022 INCREASE EFFICIENCY OF TRUCKS $15,778 $12,180 Not Implemented
SF0594 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,580 $0 Not Implemented
SF0594 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,143 $0 Not Implemented
SF0594 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $38,807 $8,920 Not Implemented
SF0594 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $54,583 $28,593 Not Implemented
SF0594 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,223 $4,344 Not Implemented
SF0594 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,717 $13,055 Not Implemented
SF0594 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,385 $9,100 Not Implemented
SF0594 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $559 $1,938 Not Implemented
LS2302 # 01 Y:2023 01 2023 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $16,597 $0 Not Implemented
LS2302 # 02 Y:2023 02 2023 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $594 $0 Not Implemented