Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
86
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0044 # 03 Y:2014 | 03 | 2014 | INSULATE BARE EQUIPMENT | $338 | $893 | Implemented |
BS0044 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,822 | $2,600 | Implemented |
BS0044 # 01 Y:2014 | 01 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $170,064 | $46,000 | Not Implemented |
BS0043 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $8,916 | $19,760 | Not Implemented |
BS0043 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,014 | $1,242 | Not Implemented |
BS0043 # 09 Y:2014 | 09 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,381 | $7,554 | Not Implemented |
BS0043 # 08 Y:2014 | 08 | 2014 | INSTALL OCCUPANCY SENSORS | $2,340 | $981 | Not Implemented |
BS0043 # 01 Y:2014 | 01 | 2014 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $63,855 | $15,000 | Implemented |
BS0043 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,042 | $52,954 | Not Implemented |
BS0043 # 03 Y:2014 | 03 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $111,915 | $69,000 | Implemented |
BS0043 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,075 | $429 | Implemented |
BS0043 # 05 Y:2014 | 05 | 2014 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $13,508 | $17,493 | Not Implemented |
BS0043 # 04 Y:2014 | 04 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $13,411 | $5,075 | Implemented |
ORS005 # 04 Y:1999 | 04 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $18,500 | $40,000 | Implemented |
ORS005 # 11 Y:1999 | 11 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $1,489 | $6,220 | Not Implemented |
ORS005 # 07 Y:1999 | 07 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $350,000 | $570,000 | Not Implemented |
ORS005 # 09 Y:1999 | 09 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $310,000 | $69,000 | Implemented |
ORS005 # 10 Y:1999 | 10 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $0 | $490 | Implemented |
ORS005 # 08 Y:1999 | 08 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $139,000 | $280,000 | Not Implemented |
ORS005 # 02 Y:1999 | 02 | 1999 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $403,875 | $572,000 | Not Implemented |
ORS005 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $55,755 | $0 | Implemented |
ORS005 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,920 | $700 | Implemented |
ORS005 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,531 | $41,296 | Implemented |
ORS005 # 06 Y:1999 | 06 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $97,200 | $11,600 | Not Implemented |
ORS004 # 05 Y:1999 | 05 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $163,623 | $60,000 | Not Implemented |