IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0323 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $685 $500 Implemented
MA0323 # 02 Y:1995 02 1995 USE RADIANT HEATER FOR SPOT HEATING $1,300 $2,820 Not Implemented
MA0323 # 01 Y:1995 01 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,470 $4,000 Not Implemented
MA0315 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,672 $3,805 Not Implemented
MA0315 # 01 Y:1994 01 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $10,053 $33,627 Not Implemented
MA0315 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,932 $1,776 Not Implemented
MA0315 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $1,350 $4,238 Not Implemented
MA0315 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $933 $0 Implemented
MA0315 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,707 $1,678 Not Implemented
MA0276 # 06 Y:1993 06 1993 SHUT OFF PILOTS IN STANDBY EQUIPMENT $40 $0 Not Implemented
MA0276 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $369 $689 Not Implemented
MA0276 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $704 $88 Not Implemented
MA0276 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,072 $3,787 Not Implemented
MA0276 # 02 Y:1993 02 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,710 $4,215 Not Implemented
MA0276 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,916 $734 Not Implemented
MA0265 # 05 Y:1993 05 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $49,714 $17,787 Not Implemented
MA0265 # 01 Y:1993 01 1993 COVER OPEN TANKS $7,538 $5,000 Implemented
MA0265 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,788 $12,305 Not Implemented
MA0265 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,525 $12,420 Implemented
MA0265 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $114 $85 Not Implemented
MA0110 # 01 Y:1987 01 1987 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,796 $7,688 Not Implemented
MA0110 # 07 Y:1987 07 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,731 $0 Not Implemented
MA0110 # 06 Y:1987 06 1987 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,075 $50 Not Implemented
MA0110 # 05 Y:1987 05 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,548 $130 Not Implemented
MA0110 # 04 Y:1987 04 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $160 $150 Not Implemented