IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,045

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0204 # 04 Y:2000 04 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,335 $3,274 n/a
SF0204 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $891 $1,920 n/a
SF0204 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,518 $13,006 n/a
SF0204 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $714 $3,660 n/a
SF0204 # 08 Y:2000 08 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $615 $46 n/a
MA0475 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,500 $8,500 Not Implemented
MA0475 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $2,450 $5,700 Implemented
MA0475 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,000 $2,400 Implemented
MA0475 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,950 $0 Implemented
MA0475 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $150 Implemented
MA0475 # 06 Y:2000 06 2000 PAY BILLS ON TIME TO AVOID LATE FEES $519 $0 Implemented
MA0475 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $220 $500 Not Implemented
MA0475 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $130 $0 Implemented
OD0171 # 01 Y:2000 01 2000 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $22,439 $93,700 Not Implemented
OD0171 # 02 Y:2000 02 2000 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $567 $0 Not Implemented
UL0248 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,938 $15,352 Implemented
UL0248 # 02 Y:2000 02 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $51,600 $6,600 Implemented
UL0248 # 03 Y:2000 03 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $28,000 $3,318 Not Implemented
MA0471 # 01 Y:2000 01 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $7,546 $18,500 Not Implemented
MA0471 # 02 Y:2000 02 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $3,105 $11,000 Not Implemented
MA0471 # 03 Y:2000 03 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $2,804 $7,200 Not Implemented
MA0471 # 04 Y:2000 04 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,548 $4,000 Not Implemented
MA0471 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,361 $19,740 Not Implemented
MA0471 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $114 $120 Implemented
IA0257 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,478 $0 Implemented