IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0161 # 05 Y:2022 05 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,440 $13,298 Not Implemented
IP0161 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $94 $0 Implemented
IP0161 # 04 Y:2022 04 2022 USE RADIANT HEATER FOR SPOT HEATING $709 $1,601 Not Implemented
IP0161 # 03 Y:2022 03 2022 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,152 $88 Implemented
IP0161 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $262 $724 Implemented
IP0161 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $128 $328 Implemented
IP0161 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,573 $0 Implemented
IP0107 # 09 Y:2018 09 2018 RECOVER WASTE HEAT FROM EQUIPMENT $18,691 $85,000 Implemented
IP0107 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $582 $2,219 Implemented
IP0107 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,878 $39,406 Implemented
IP0107 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,610 $7,858 Implemented
IP0107 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,646 $9,560 Implemented
IP0107 # 04 Y:2018 04 2018 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $957 $2,201 Implemented
IP0107 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $629 $1,485 Not Implemented
IP0107 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,840 $3,587 Implemented
IP0107 # 01 Y:2018 01 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,310 $596 Implemented
IP0088 # 01 Y:2017 01 2017 AIR CONDITION ONLY SPACE NECESSARY $3,195 $10 Not Implemented
IP0088 # 02 Y:2017 02 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,435 $0 Not Implemented
IP0088 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,562 $3 Implemented
IP0088 # 13 Y:2017 13 2017 INSULATE BARE EQUIPMENT $1,125 $2,464 Not Implemented
IP0088 # 12 Y:2017 12 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $394 $871 Not Implemented
IP0088 # 09 Y:2017 09 2017 OPTIMIZE PLANT POWER FACTOR $2,569 $1,746 Not Implemented
IP0088 # 11 Y:2017 11 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,470 $8,388 Not Implemented
IP0088 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $558 $90 Implemented
IP0088 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $945 $750 Implemented