IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0644 # 02 Y:2002 02 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $570 $3 Implemented
OK0644 # 03 Y:2002 03 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,441 $1,738 Implemented
KU0505 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $800 $0 Implemented
KU0505 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $510 $260 Implemented
KU0505 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $720 $340 Implemented
KU0505 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $400 Implemented
KU0505 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,350 $20 Implemented
KU0505 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,140 $9,600 Implemented
KU0505 # 09 Y:1998 09 1998 $25,940 $2,560 Implemented
KU0505 # 08 Y:1998 08 1998 $75,000 $193,000 Implemented
OK0528 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $962 $114 Implemented
OK0528 # 01 Y:1997 01 1997 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $17,998 $48,754 Implemented
OK0528 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,011 $3,500 Implemented
OK0528 # 05 Y:1997 05 1997 USE OPTIMUM THICKNESS INSULATION $747 $166 Implemented
KU0285 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,527 $24,000 Implemented
KU0285 # 11 Y:1989 11 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,539 $50,000 Implemented
KU0285 # 08 Y:1989 08 1989 RECOVER AND REUSE COOLING WATER $16,548 $2,500 Implemented
KU0285 # 07 Y:1989 07 1989 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $906 $2,500 Implemented
KU0285 # 06 Y:1989 06 1989 INSTALL AUTOMATIC STACK DAMPER $3,601 $7,600 Implemented
KU0285 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,478 $22,600 Implemented
KU0285 # 01 Y:1989 01 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,382 $1,500 Implemented
KU0156 # 02 Y:1985 02 1985 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $9,544 $3,342 Implemented
KU0156 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,064 $2,200 Implemented
KU0156 # 06 Y:1985 06 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,611 $1,200 Implemented
KU0156 # 07 Y:1985 07 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,298 $1,200 Implemented