IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0809 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,772 $1,000 Implemented
MA0809 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $2,332 $150 Implemented
MA0809 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,745 $11,800 Not Implemented
MA0809 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $7,376 $23,715 Not Implemented
MA0809 # 05 Y:2019 05 2019 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,114 $4,500 Implemented
MA0809 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,036 $3,057 Implemented
MA0761 # 05 Y:2016 05 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $864 $342 Not Implemented
MA0761 # 04 Y:2016 04 2016 MINIMIZE WATER USAGE $3,035 $4,050 Not Implemented
MA0761 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,889 $2,685 Not Implemented
MA0761 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $22,997 $134,000 Not Implemented
MA0761 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $816 $2,000 Not Implemented
MA0761 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,969 $6,409 Not Implemented
MAS014 # 01 Y:2011 01 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $47,869 $10,650 Not Implemented
MAS014 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,371 $17,325 Not Implemented
MAS014 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $200 Not Implemented
MAS014 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,256 $8,190 Not Implemented
MAS014 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,033 $200 Not Implemented
MAS014 # 04 Y:2011 04 2011 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,288 $2,070 Not Implemented
MAS014 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $700 Not Implemented
MA0669 # 01 Y:2011 01 2011 REPLACE BOILER $28,774 $63,300 Implemented
MA0669 # 02 Y:2011 02 2011 INSULATE BARE EQUIPMENT $12,439 $25,000 Not Implemented
MA0669 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $10,179 $11,190 Implemented
MA0669 # 04 Y:2011 04 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,848 $1,500 Implemented
MA0669 # 05 Y:2011 05 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,576 $25,250 Not Implemented
MA0669 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $736 $349 Not Implemented