IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0290 # 08 Y:2000 08 2000 MOVE PRODUCT USING MECHANICAL MEANS $26,063 $13,600 Implemented
ME0290 # 06 Y:2000 06 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $4,750 $9,000 Not Implemented
ME0290 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,685 $2,475 Implemented
ME0290 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,690 $5,000 Implemented
ME0290 # 03 Y:2000 03 2000 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,732 $1,800 Implemented
ME0290 # 02 Y:2000 02 2000 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $48,618 $10,860 Not Implemented
ME0290 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $59,165 $59,168 Not Implemented
ME0290 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $74,857 $270,000 Not Implemented
ME0289 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,507 $2,400 Implemented
ME0289 # 01 Y:2000 01 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $66,856 $175,000 Not Implemented
ME0289 # 02 Y:2000 02 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,387 $3,165 Implemented
ME0289 # 06 Y:2000 06 2000 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $300 $463 Not Implemented
ME0289 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,100 $6,600 Not Implemented
ME0289 # 04 Y:2000 04 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,671 $5,350 Not Implemented
ME0205 # 08 Y:1996 08 1996 INSULATE BARE EQUIPMENT $196 $270 Implemented
ME0205 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $244 $38 Implemented
ME0205 # 13 Y:1996 13 1996 MINIMIZE WATER USAGE $1,236 $75 Implemented
ME0205 # 01 Y:1996 01 1996 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $115,428 $0 Implemented
ME0205 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $1,004 $2,112 Not Implemented
ME0205 # 09 Y:1996 09 1996 REPAIR AND ELIMINATE STEAM LEAKS $11,040 $200 Implemented
ME0205 # 11 Y:1996 11 1996 RECOVER AND REUSE COOLING WATER $2,370 $2,400 Not Implemented
ME0205 # 03 Y:1996 03 1996 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,380 $453 Not Implemented
ME0205 # 12 Y:1996 12 1996 MINIMIZE WATER USAGE $1,946 $3,800 Not Implemented
ME0205 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,183 $7,572 Implemented
ME0205 # 14 Y:1996 14 1996 MINIMIZE WATER USAGE $455 $415 Not Implemented