Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
157
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0804 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,678 | $51,877 | n/a |
OR0804 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,461 | $0 | n/a |
OR0804 # 02 Y:2024 | 02 | 2024 | INCREASE EFFICIENCY OF TRUCKS | $473,339 | $1,593,482 | n/a |
OR0804 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $634 | $0 | n/a |
OR0804 # 05 Y:2024 | 05 | 2024 | INSULATE BARE EQUIPMENT | $1,439 | $4,063 | n/a |
OR0804 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,473 | $22,751 | n/a |
OR0782 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $4,302 | $41,745 | Implemented |
OR0782 # 02 Y:2023 | 02 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $34,701 | $316,866 | Not Implemented |
OR0782 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,455 | $3,143 | Implemented |
OR0749 # 03 Y:2022 | 03 | 2022 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,003 | $11,329 | Implemented |
OR0749 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $999 | $0 | Implemented |
OR0749 # 02 Y:2022 | 02 | 2022 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $43,522 | $28,094 | Not Implemented |
OR0749 # 04 Y:2022 | 04 | 2022 | REPLACE BOILER | $122,100 | $1,640,000 | Implemented |
OR0744 # 01 Y:2021 | 01 | 2021 | MINIMIZE WATER USAGE | $2,348 | $0 | Implemented |
OR0744 # 05 Y:2021 | 05 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,065 | $18,105 | Implemented |
OR0744 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,766 | $8,671 | Not Implemented |
OR0744 # 02 Y:2021 | 02 | 2021 | OPTIMIZE PLANT POWER FACTOR | $15,238 | $36,792 | Implemented |
OR0744 # 03 Y:2021 | 03 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,963 | $2,340 | Implemented |
OR0742 # 01 Y:2021 | 01 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,010 | $0 | Implemented |
OR0742 # 02 Y:2021 | 02 | 2021 | REDESIGN PROCESS | $3,895 | $0 | Implemented |
OR0742 # 04 Y:2021 | 04 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $10,200 | $38,018 | Not Implemented |
OR0742 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,662 | $6,857 | Not Implemented |
OR0734 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,078 | $220 | Not Implemented |
OR0734 # 02 Y:2020 | 02 | 2020 | INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT | $44,429 | $117,388 | Not Implemented |
OR0734 # 01 Y:2020 | 01 | 2020 | INCREASE USE OF AUTOMATION | $126,455 | $360,000 | Not Implemented |