Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0257 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,762 | $79,343 | n/a |
UU0257 # 02 Y:2024 | 02 | 2024 | INCREASE USE OF AUTOMATION | $2,630 | $12,300 | n/a |
UU0257 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,252 | $5,785 | n/a |
UU0257 # 01 Y:2024 | 01 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,024 | $16,577 | n/a |
UU0257 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,182 | $19,121 | n/a |
UU0126 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,423 | $2,000 | Implemented |
UU0126 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,358 | $90 | Implemented |
UU0126 # 04 Y:2017 | 04 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,977 | $8,120 | Not Implemented |
UU0126 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $26,315 | $176,427 | Not Implemented |
UU0126 # 02 Y:2017 | 02 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $27,838 | $3,980 | Implemented |
UU0126 # 01 Y:2017 | 01 | 2017 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $207,807 | $2,000,000 | Not Implemented |
UU0101 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,230 | $3,050 | Not Implemented |
UU0101 # 06 Y:2006 | 06 | 2006 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $100,330 | $52,800 | Not Implemented |
UU0101 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,770 | $4,140 | Not Implemented |
UU0101 # 04 Y:2006 | 04 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,760 | $10,030 | Not Implemented |
UU0101 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,280 | $4,150 | Not Implemented |
UU0101 # 01 Y:2006 | 01 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,190 | $10,000 | Not Implemented |
UU0077 # 04 Y:2004 | 04 | 2004 | ADJUST PH FOR NEUTRALIZATION | $12,850 | $45,920 | Not Implemented |
UU0077 # 03 Y:2004 | 03 | 2004 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $14,890 | $45,000 | Implemented |
UU0077 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,520 | $5,000 | Implemented |
UU0077 # 01 Y:2004 | 01 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $12,125 | $2,670 | Not Implemented |
UU0019 # 01 Y:2002 | 01 | 2002 | INSTALL SKYLIGHTS | $12,317 | $7,800 | Not Implemented |
UU0019 # 06 Y:2002 | 06 | 2002 | ISOLATE HOT OR COLD EQUIPMENT | $12,399 | $22,269 | Implemented |
UU0019 # 05 Y:2002 | 05 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $17,300 | $18,000 | Not Implemented |
UU0019 # 03 Y:2002 | 03 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,839 | $2,400 | Not Implemented |