IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0257 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $26,762 $79,343 n/a
UU0257 # 02 Y:2024 02 2024 INCREASE USE OF AUTOMATION $2,630 $12,300 n/a
UU0257 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,252 $5,785 n/a
UU0257 # 01 Y:2024 01 2024 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,024 $16,577 n/a
UU0257 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,182 $19,121 n/a
UU0126 # 06 Y:2017 06 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,423 $2,000 Implemented
UU0126 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,358 $90 Implemented
UU0126 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,977 $8,120 Not Implemented
UU0126 # 03 Y:2017 03 2017 REPLACE BOILER $26,315 $176,427 Not Implemented
UU0126 # 02 Y:2017 02 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $27,838 $3,980 Implemented
UU0126 # 01 Y:2017 01 2017 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $207,807 $2,000,000 Not Implemented
UU0101 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,230 $3,050 Not Implemented
UU0101 # 06 Y:2006 06 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $100,330 $52,800 Not Implemented
UU0101 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $3,770 $4,140 Not Implemented
UU0101 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,760 $10,030 Not Implemented
UU0101 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,280 $4,150 Not Implemented
UU0101 # 01 Y:2006 01 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,190 $10,000 Not Implemented
UU0077 # 04 Y:2004 04 2004 ADJUST PH FOR NEUTRALIZATION $12,850 $45,920 Not Implemented
UU0077 # 03 Y:2004 03 2004 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $14,890 $45,000 Implemented
UU0077 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,520 $5,000 Implemented
UU0077 # 01 Y:2004 01 2004 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $12,125 $2,670 Not Implemented
UU0019 # 01 Y:2002 01 2002 INSTALL SKYLIGHTS $12,317 $7,800 Not Implemented
UU0019 # 06 Y:2002 06 2002 ISOLATE HOT OR COLD EQUIPMENT $12,399 $22,269 Implemented
UU0019 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $17,300 $18,000 Not Implemented
UU0019 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,839 $2,400 Not Implemented