IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

93

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0811 # 06 Y:2005 06 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,877 $1,300 Implemented
GT0811 # 01 Y:2005 01 2005 IMPROVE LUBRICATION PRACTICES $3,405 $0 Implemented
GT0811 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,824 $20,700 Implemented
GT0811 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,607 $6,694 Not Implemented
GT0811 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,135 $3,000 Implemented
GT0811 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,119 $5,334 Not Implemented
GT0811 # 08 Y:2005 08 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $162,720 $25,000 Not Implemented
GT0811 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,312 $750 Implemented
MS0285 # 02 Y:2005 02 2005 INSTALL TIMERS AND/OR THERMOSTATS $11,445 $575 Not Implemented
MS0285 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,062 $151 Implemented
MS0285 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,503 $138 Implemented
MS0285 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $147,024 $1,342,000 Not Implemented
MS0285 # 05 Y:2005 05 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $671 $972 Not Implemented
OR0493 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,900 $1,900 Not Implemented
OR0493 # 01 Y:2005 01 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $66,200 $1,000 Not Implemented
OR0493 # 04 Y:2005 04 2005 USE OPTIMUM TEMPERATURE $11,000 $13,000 Not Implemented
OR0493 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,500 $0 Not Implemented
OR0493 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,400 $2,500 Not Implemented
OR0493 # 03 Y:2005 03 2005 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $5,400 $1,000 Not Implemented
OR0493 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $2,400 $3,600 Not Implemented
OR0493 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,900 $17,000 Not Implemented
UF0367 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $124 $0 Implemented
UF0367 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $200 $0 Not Implemented
UF0367 # 03 Y:2005 03 2005 ELIMINATE A BY-PRODUCT $4,483 $870 Implemented
UF0367 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,578 $0 Implemented