Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 209 | Misc. Food And Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0397 # 02 Y:2011 | 02 | 2011 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $15,024 | $14,500 | Not Implemented |
BD0397 # 03 Y:2011 | 03 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,550 | $6,000 | Not Implemented |
BD0397 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $6,237 | $4,440 | Not Implemented |
BD0397 # 05 Y:2011 | 05 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,796 | $765 | Not Implemented |
BD0397 # 06 Y:2011 | 06 | 2011 | INSTALL TURBULATORS | $4,508 | $1,500 | Not Implemented |
BD0397 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,439 | $650 | Not Implemented |
BD0397 # 08 Y:2011 | 08 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,214 | $5,820 | Not Implemented |
BD0397 # 01 Y:2011 | 01 | 2011 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $23,085 | $6,000 | Not Implemented |
MAS014 # 01 Y:2011 | 01 | 2011 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $47,869 | $10,650 | Not Implemented |
MAS014 # 02 Y:2011 | 02 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $15,371 | $17,325 | Not Implemented |
MAS014 # 05 Y:2011 | 05 | 2011 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $2,033 | $200 | Not Implemented |
MAS014 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $493 | $200 | Not Implemented |
MAS014 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $496 | $700 | Not Implemented |
MAS014 # 03 Y:2011 | 03 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,256 | $8,190 | Not Implemented |
MAS014 # 04 Y:2011 | 04 | 2011 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,288 | $2,070 | Not Implemented |
GT0884 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,890 | $44,900 | Implemented |
GT0884 # 02 Y:2011 | 02 | 2011 | INSTALL OCCUPANCY SENSORS | $4,290 | $210 | Implemented |
GT0884 # 03 Y:2011 | 03 | 2011 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $57,100 | $361,600 | Not Implemented |
GT0884 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,400 | $600 | Implemented |
GT0884 # 05 Y:2011 | 05 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,610 | $14,000 | Not Implemented |
GT0884 # 06 Y:2011 | 06 | 2011 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,894 | $43,550 | Not Implemented |
GT0884 # 07 Y:2011 | 07 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $29,550 | $2,000 | Implemented |
GT0884 # 08 Y:2011 | 08 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $31,010 | $160,650 | Not Implemented |
GT0884 # 09 Y:2011 | 09 | 2011 | OPTIMIZE PLANT POWER FACTOR | $6,584 | $37,790 | Not Implemented |
SF0398 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,251 | $0 | Implemented |