IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
SIC 209 Misc. Food And Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0397 # 02 Y:2011 02 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $15,024 $14,500 Not Implemented
BD0397 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,550 $6,000 Not Implemented
BD0397 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $6,237 $4,440 Not Implemented
BD0397 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,796 $765 Not Implemented
BD0397 # 06 Y:2011 06 2011 INSTALL TURBULATORS $4,508 $1,500 Not Implemented
BD0397 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,439 $650 Not Implemented
BD0397 # 08 Y:2011 08 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,214 $5,820 Not Implemented
BD0397 # 01 Y:2011 01 2011 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $23,085 $6,000 Not Implemented
MAS014 # 01 Y:2011 01 2011 MODERATE COOLING TOWER OUTLET TEMPERATURE $47,869 $10,650 Not Implemented
MAS014 # 02 Y:2011 02 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $15,371 $17,325 Not Implemented
MAS014 # 05 Y:2011 05 2011 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $2,033 $200 Not Implemented
MAS014 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $200 Not Implemented
MAS014 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $700 Not Implemented
MAS014 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,256 $8,190 Not Implemented
MAS014 # 04 Y:2011 04 2011 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,288 $2,070 Not Implemented
GT0884 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,890 $44,900 Implemented
GT0884 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $4,290 $210 Implemented
GT0884 # 03 Y:2011 03 2011 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $57,100 $361,600 Not Implemented
GT0884 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,400 $600 Implemented
GT0884 # 05 Y:2011 05 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,610 $14,000 Not Implemented
GT0884 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,894 $43,550 Not Implemented
GT0884 # 07 Y:2011 07 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $29,550 $2,000 Implemented
GT0884 # 08 Y:2011 08 2011 UPGRADE CONTROLS ON COMPRESSORS $31,010 $160,650 Not Implemented
GT0884 # 09 Y:2011 09 2011 OPTIMIZE PLANT POWER FACTOR $6,584 $37,790 Not Implemented
SF0398 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,251 $0 Implemented