IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

487

matching recommendations
Reset
SIC 2092 Fresh Or Frozen Prepared Fish
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ORS003 # 07 Y:1999 07 1999 MINIMIZE WATER USAGE $-1,640 $4,000 Not Implemented
ORS003 # 08 Y:1999 08 1999 USE OTHER WASTE CONCENTRATION METHODS $39,020 $34,600 Implemented
ORS003 # 09 Y:1999 09 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $80,220 $15,400 Implemented
ORS002 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,472 $27,939 Implemented
ORS002 # 02 Y:1999 02 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,055 $15,400 Implemented
ORS002 # 03 Y:1999 03 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $880 $700 Implemented
ORS002 # 04 Y:1999 04 1999 REPLACE BOILER $12,100 $0 Implemented
ORS002 # 05 Y:1999 05 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $166,000 $121,000 Implemented
ORS002 # 06 Y:1999 06 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $90,560 $64,000 Not Implemented
ORS002 # 07 Y:1999 07 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $67,400 $200,000 Not Implemented
ORS002 # 08 Y:1999 08 1999 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $5,954 $0 Implemented
OR0354 # 01 Y:1999 01 1999 CLOSE OFF UNNEEDED STEAM LINES $5,250 $950 Implemented
OR0354 # 02 Y:1999 02 1999 USE MINIMUM STEAM OPERATING PRESSURE $560 $0 Not Implemented
OR0354 # 03 Y:1999 03 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $750 $500 Implemented
OR0354 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $2,049 Implemented
OR0354 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $950 $0 Not Implemented
OR0351 # 01 Y:1999 01 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,756 $0 Not Implemented
OR0351 # 02 Y:1999 02 1999 AVOID FROST FORMATION ON EVAPORATORS $31,270 $48,000 Not Implemented
OR0351 # 03 Y:1999 03 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,590 $0 Implemented
OR0351 # 04 Y:1999 04 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,270 $3,100 Not Implemented
OR0351 # 05 Y:1999 05 1999 OPTIMIZE PLANT POWER FACTOR $1,595 $9,600 Not Implemented
ME0253 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,662 $83,099 Implemented
ME0253 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,977 $26,897 Implemented
ME0253 # 03 Y:1998 03 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,878 $10,000 Implemented
ME0253 # 04 Y:1998 04 1998 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,836 $29,200 Not Implemented