Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
456
matching recommendationsSIC | 2096 | Potato Chips And Similar Snacks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1070 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $22,179 | $2,400 | n/a |
UD1070 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $5,413 | $160 | n/a |
UD1070 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,729 | $2,893 | n/a |
UD1070 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,744 | $0 | n/a |
UD1070 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $92,634 | $704,952 | n/a |
MZ0351 # 07 Y:2023 | 07 | 2023 | INSULATE BARE EQUIPMENT | $1,019 | $814 | n/a |
MZ0351 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,533 | $640 | n/a |
MZ0351 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,137 | $23,955 | n/a |
MZ0351 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $72,794 | $24,018 | n/a |
MZ0351 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,603 | $3,000 | n/a |
MZ0351 # 08 Y:2023 | 08 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $42,244 | $83,200 | n/a |
MZ0351 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,304 | $0 | n/a |
MZ0351 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $14,579 | $16,300 | n/a |
SF0539 # 04 Y:2019 | 04 | 2019 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,211 | $6,004 | Not Implemented |
SF0539 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $862 | $0 | Implemented |
SF0539 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $856 | $1,509 | Not Implemented |
SF0539 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,584 | $18,239 | Implemented |
OR0712 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $17,619 | $17,511 | Implemented |
OR0712 # 01 Y:2018 | 01 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $200,991 | $689,600 | Implemented |
OR0712 # 02 Y:2018 | 02 | 2018 | REPLACE BOILER | $56,825 | $365,566 | Not Implemented |
OR0712 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,006 | $21,662 | Not Implemented |
OR0712 # 03 Y:2018 | 03 | 2018 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $33,804 | $25,271 | Not Implemented |
OR0712 # 06 Y:2018 | 06 | 2018 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $6,403 | $30,000 | Implemented |
UU0126 # 02 Y:2017 | 02 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $27,838 | $3,980 | Implemented |
UU0126 # 01 Y:2017 | 01 | 2017 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $207,807 | $2,000,000 | Not Implemented |