IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

456

matching recommendations
Reset
SIC 2096 Potato Chips And Similar Snacks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1070 # 02 Y:2024 02 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,179 $2,400 n/a
UD1070 # 01 Y:2024 01 2024 REPAIR AND ELIMINATE STEAM LEAKS $5,413 $160 n/a
UD1070 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,729 $2,893 n/a
UD1070 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,744 $0 n/a
UD1070 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $92,634 $704,952 n/a
MZ0351 # 07 Y:2023 07 2023 INSULATE BARE EQUIPMENT $1,019 $814 n/a
MZ0351 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,533 $640 n/a
MZ0351 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,137 $23,955 n/a
MZ0351 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $72,794 $24,018 n/a
MZ0351 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,603 $3,000 n/a
MZ0351 # 08 Y:2023 08 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $42,244 $83,200 n/a
MZ0351 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,304 $0 n/a
MZ0351 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $14,579 $16,300 n/a
SF0539 # 04 Y:2019 04 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,211 $6,004 Not Implemented
SF0539 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $862 $0 Implemented
SF0539 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $856 $1,509 Not Implemented
SF0539 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,584 $18,239 Implemented
OR0712 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $17,619 $17,511 Implemented
OR0712 # 01 Y:2018 01 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $200,991 $689,600 Implemented
OR0712 # 02 Y:2018 02 2018 REPLACE BOILER $56,825 $365,566 Not Implemented
OR0712 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,006 $21,662 Not Implemented
OR0712 # 03 Y:2018 03 2018 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $33,804 $25,271 Not Implemented
OR0712 # 06 Y:2018 06 2018 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $6,403 $30,000 Implemented
UU0126 # 02 Y:2017 02 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $27,838 $3,980 Implemented
UU0126 # 01 Y:2017 01 2017 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $207,807 $2,000,000 Not Implemented