IAC logo
IAC Assessment: CI0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CI0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of California, Irvine
Assessment Year 2025
Principal Product Tortilla Chips, Taco Shells & Pellet Snacks
NAICS 311919 - Other Snack Food Manufacturing
SIC 2096 - Potato Chips And Similar Snacks
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 133,665
Annual Production 30,000,000 Pounds
Production Hrs. Annual 6,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $809,513 3,557,422 kWh $0.23
Electricity Demand $233,366 17,164 kW-months/year $13.60
Electricity Fees $59,426 - $ -
Natural Gas $1,583,938 105,280 MMBtu $15.05
Other Gas $101,940 1 MMBtu $101,940.00
TOTAL ENERGY COSTS $2,788,183
RECOMMENDED SAVINGS* $794,604 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$316,788
Cost:
$3,200,000
- - - - $316,788 21,056 -
-
kWh
-
-
kW-months/year
$316,788
21,056
MMBtu
02: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$159,105
Cost:
$669,600
$146,049 651,000 $13,056 960 - - $146,049
651,000
kWh
$13,056
960
kW-months/year
-
-
MMBtu
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$127,862
Cost:
$20,000
$118,122 518,991 $9,740 716 - - $118,122
518,991
kWh
$9,740
716
kW-months/year
-
-
MMBtu
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$67,904
Cost:
$174,000
$67,904 298,346 - - - - $67,904
298,346
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$57,280
Cost:
$7,800
$51,862 227,864 $5,418 398 - - $51,862
227,864
kWh
$5,418
398
kW-months/year
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$26,465
Cost:
$20,000
$23,821 104,662 $2,644 194 - - $23,821
104,662
kWh
$2,644
194
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,542
Cost:
$3,762
$13,640 59,928 $3,902 287 - - $13,640
59,928
kWh
$3,902
287
kW-months/year
-
-
MMBtu
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$14,804
Cost:
$4,000
$10,897 47,880 $3,907 287 - - $10,897
47,880
kWh
$3,907
287
kW-months/year
-
-
MMBtu
09: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$6,854
Cost:
$200
- - $6,854 504 - - -
-
kWh
$6,854
504
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$794,604
Cost:
$4,099,362
$432,295 1,908,671 $45,521 3,347 $316,788 21,056 $432,295
1,908,671
kWh
$45,521
3,347
kW-months/year
$316,788
21,056
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas