Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
461
matching recommendationsSIC | 2096 | Potato Chips And Similar Snacks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0257 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,762 | $79,343 | n/a |
UU0257 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,182 | $19,121 | n/a |
UU0257 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,252 | $5,785 | n/a |
UU0257 # 02 Y:2024 | 02 | 2024 | INCREASE USE OF AUTOMATION | $2,630 | $12,300 | n/a |
UU0257 # 01 Y:2024 | 01 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $9,024 | $16,577 | n/a |
UD1070 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $22,179 | $2,000 | Implemented |
UD1070 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $5,413 | $1,000 | Implemented |
UD1070 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,729 | $2,893 | Not Implemented |
UD1070 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,744 | $0 | Not Implemented |
UD1070 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $92,634 | $704,952 | Not Implemented |
MZ0351 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $14,579 | $16,300 | Not Implemented |
MZ0351 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,533 | $640 | Not Implemented |
MZ0351 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $72,794 | $24,018 | Not Implemented |
MZ0351 # 08 Y:2023 | 08 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $42,244 | $83,200 | Not Implemented |
MZ0351 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,304 | $0 | Not Implemented |
MZ0351 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,603 | $3,000 | Implemented |
MZ0351 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $49,137 | $23,955 | Not Implemented |
MZ0351 # 07 Y:2023 | 07 | 2023 | INSULATE BARE EQUIPMENT | $1,019 | $814 | Not Implemented |
SF0539 # 04 Y:2019 | 04 | 2019 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,211 | $6,004 | Not Implemented |
SF0539 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $856 | $1,509 | Not Implemented |
SF0539 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $862 | $0 | Implemented |
SF0539 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,584 | $18,239 | Implemented |
OR0712 # 03 Y:2018 | 03 | 2018 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $33,804 | $25,271 | Not Implemented |
OR0712 # 06 Y:2018 | 06 | 2018 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $6,403 | $30,000 | Implemented |
OR0712 # 02 Y:2018 | 02 | 2018 | REPLACE BOILER | $56,825 | $365,566 | Not Implemented |