IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

456

matching recommendations
Reset
SIC 2096 Potato Chips And Similar Snacks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0196 # 02 Y:1996 02 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,757 $0 Not Implemented
ME0196 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,035 $9,015 Implemented
ME0196 # 04 Y:1996 04 1996 PAY UTILITY BILLS ON TIME $628 $0 Implemented
ME0196 # 05 Y:1996 05 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $626 $1,075 Implemented
ME0196 # 06 Y:1996 06 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $397 $1,000 Implemented
ME0196 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $236 $126 Implemented
ME0196 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $229 $300 Implemented
ME0196 # 09 Y:1996 09 1996 MINIMIZE WATER USAGE $928 $250 Implemented
KU0457 # 01 Y:1996 01 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,949 $26,000 Not Implemented
KU0457 # 02 Y:1996 02 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,591 $1,000 Implemented
KU0457 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,835 $10,180 Implemented
KU0457 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,711 $1,800 Implemented
KU0457 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,034 $3,130 Implemented
KU0457 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $813 $155 Implemented
KU0457 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $592 $165 Implemented
KU0457 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $433 $663 Implemented
KU0457 # 09 Y:1996 09 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $272 $480 Implemented
UF0139 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $75,430 $0 Implemented
UF0139 # 02 Y:1996 02 1996 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $18,648 $0 Implemented
UF0139 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,180 $11,068 Not Implemented
UF0139 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,372 $57,360 Not Implemented
UF0139 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,506 $350 Implemented
UF0139 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,271 $35,000 Not Implemented
UF0139 # 07 Y:1996 07 1996 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,581 $1,125 Not Implemented
UF0139 # 08 Y:1996 08 1996 RECOVER WASTE HEAT FROM EQUIPMENT $6,118 $10,800 Not Implemented