IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
SIC 2097 Manufactured Ice
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0367 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $200 $0 Not Implemented
SD0327 # 02 Y:2003 02 2003 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $15,838 $12,500 Not Implemented
SD0327 # 01 Y:2003 01 2003 UPGRADE OBSOLETE EQUIPMENT $50,120 $850,000 Not Implemented
SD0327 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,257 $3,225 Not Implemented
SD0327 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $608 $32 Not Implemented
SD0327 # 05 Y:2003 05 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,124 $5,000 Not Implemented
NC0223 # 06 Y:2001 06 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,524 $40,000 Not Implemented
NC0223 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $186 $500 Implemented
NC0223 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $2,592 Not Implemented
NC0223 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $160 $50 Implemented
NC0223 # 04 Y:2001 04 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,729 $10,000 Not Implemented
NC0223 # 01 Y:2001 01 2001 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $1,140 $1,800 Implemented
UF0197 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,594 $15,614 Implemented
UF0197 # 03 Y:1998 03 1998 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $15,069 $63,950 Not Implemented
UF0197 # 02 Y:1998 02 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,334 $1,200 Implemented
UF0197 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $3,682 Not Implemented
UF0197 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,990 $1,150 Implemented
UF0197 # 06 Y:1998 06 1998 UTILIZE OUTSIDE CONTRACTING $108 $0 Not Implemented
UF0197 # 07 Y:1998 07 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,315 $7,000 Not Implemented
UF0197 # 08 Y:1998 08 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,143 $1,005 Not Implemented
UF0197 # 09 Y:1998 09 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $64,930 $280,000 Not Implemented
KG0097 # 05 Y:1997 05 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $30,888 $43,000 n/a
KG0097 # 04 Y:1997 04 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $596,163 $8,894 n/a
KG0097 # 03 Y:1997 03 1997 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $90,970 $800 n/a
KG0097 # 02 Y:1997 02 1997 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $8,416 $8,894 n/a