IAC logo
IAC Assessment: NC0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2001
Principal Product Ice
NAICS n/a
SIC 2097 - Manufactured Ice
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 15,000
Annual Production 110,000,000 Pounds
Production Hrs. Annual 2,000
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,914 1,919,314 kWh $0.03
Electricity Demand $51,427 6,262 kW-months/year $8.21
Electricity Fees $4,816 - $ -
TOTAL ENERGY COSTS $115,157
RECOMMENDED SAVINGS* $16,229 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,486
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$1,140
Cost:
$1,800
$(-22) (-746) $(-38) (-4) $1,200 - $(-22)
(-746)
kWh
$(-38)
(-4)
kW-months/year
$1,200
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$160
Cost:
$50
$59 2,020 $101 12 - - $59
2,020
kWh
$101
12
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$490
Cost:
$2,592
$233 7,958 $257 31 - - $233
7,958
kWh
$257
31
kW-months/year
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,729
Cost:
$10,000
$2,677 91,367 $1,052 126 - - $2,677
91,367
kWh
$1,052
126
kW-months/year
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$186
Cost:
$500
$130 4,424 $56 6 - - $130
4,424
kWh
$56
6
kW-months/year
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$10,524
Cost:
$40,000
$2,318 (-24,750) $8,206 983 - - $2,318
(-24,750)
kWh
$8,206
983
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$16,229
Cost:
$54,942
$5,395 80,273 $9,634 1,154 $1,200 - $5,395
80,273
kWh
$9,634
1,154
kW-months/year
$1,200
-
$
TOTAL IMPLEMENTED Savings:
$1,486
Cost:
$2,350
$167 5,698 $119 14 $1,200 - $167
5,698
kWh
$119
14
kW-months/year
$1,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes