IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

123

matching recommendations
Reset
SIC 2098 Macaroni And Spaghetti
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0180 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,240 $5,343 Not Implemented
AS0180 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $63,244 $50,000 Implemented
AS0180 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,003 $0 Not Implemented
AS0180 # 08 Y:1996 08 1996 INSTALL TIMERS AND/OR THERMOSTATS $391 $320 Not Implemented
AS0180 # 09 Y:1996 09 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,648 $30 Implemented
AS0180 # 10 Y:1996 10 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $330 $30 Implemented
AS0180 # 11 Y:1996 11 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,041 $1,780 Implemented
MO0162 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,268 $1,595 Implemented
MO0162 # 02 Y:1995 02 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,585 $200 Implemented
MO0162 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,761 $2,978 Implemented
MO0162 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,142 $8,220 Implemented
MO0162 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $158 $0 Implemented
MO0162 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,300 $33,261 Implemented
MO0162 # 07 Y:1995 07 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,699 $225 Implemented
MO0162 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,282 $5,203 Implemented
MO0162 # 09 Y:1995 09 1995 USE SYNTHETIC LUBRICANT $273 $80 Implemented
MO0162 # 10 Y:1995 10 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $697 $100 Implemented
MO0162 # 11 Y:1995 11 1995 REDUCE SCRAP PRODUCTION $4,050 $300 Implemented
SF0070 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $602 $610 Implemented
SF0070 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,041 $9,983 Not Implemented
SF0070 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $2,395 $4,330 Not Implemented
SF0070 # 04 Y:1995 04 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,535 $14,820 Implemented
SF0070 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $1,695 $1,918 Implemented
SF0070 # 06 Y:1995 06 1995 USE SYNTHETIC LUBRICANT $421 $758 Implemented
SF0070 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,114 $40 Implemented