IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0239 # 02 Y:2024 02 2024 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,623 $17,500 n/a
DL0239 # 03 Y:2024 03 2024 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $37,050 $110,000 n/a
DL0239 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $61,029 $10,000 n/a
DL0239 # 05 Y:2024 05 2024 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,543 $2,247 n/a
DL0239 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $397,405 $140,000 n/a
DL0239 # 07 Y:2024 07 2024 UPGRADE CONTROLS ON COMPRESSORS $61,587 $28,225 n/a
DL0239 # 08 Y:2024 08 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,185 $51,431 n/a
DL0239 # 09 Y:2024 09 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $44,586 $1,934 n/a
DL0239 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $17,306 $1,250 n/a
NC0586 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,873 $9,000 Implemented
NC0586 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,081 $2,500 Implemented
NC0586 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $200 Implemented
NC0586 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $988 $2,500 Implemented
NC0586 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $2,834 $4,685 Implemented
NC0586 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $929,030 $400,000 Implemented
NC0586 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,008 $2,890 Implemented
OD0135 # 04 Y:1999 04 1999 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $413 $1,870 Not Implemented
OD0135 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $79 $20 Not Implemented
OD0135 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $849 $800 Implemented
OD0135 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $773 Not Implemented
OD0124 # 02 Y:1998 02 1998 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $437 $1,290 Not Implemented
OD0124 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,225 $5,625 Not Implemented
OD0124 # 04 Y:1998 04 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,805 $4,595 Not Implemented
OD0124 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,935 $6,012 Implemented
OD0048 # 01 Y:1996 01 1996 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,211 $13,391 Not Implemented