IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,489

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0860 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,661 $1,000 Implemented
GT0860 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,730 $1,000 Implemented
GT0860 # 04 Y:2009 04 2009 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,140 $6,750 Not Implemented
GT0860 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,419 $7,066 Implemented
GT0860 # 06 Y:2009 06 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,213 $12,000 Not Implemented
GT0860 # 07 Y:2009 07 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,199 $4,250 Not Implemented
GT0860 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,084 $16,350 Implemented
GT0860 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,361 $14,795 Implemented
MA0643 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $239,800 $170,000 Not Implemented
MA0643 # 02 Y:2009 02 2009 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $43,089 $6,000 Implemented
MA0643 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,728 $18,400 Implemented
MA0643 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $6,439 $12,500 Implemented
MA0643 # 05 Y:2009 05 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,019 $3,800 Not Implemented
UW0016 # 01 Y:2008 01 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $29,638 $0 Implemented
UW0016 # 02 Y:2008 02 2008 REPLACE BOILER $10,000 $20,000 Not Implemented
UW0016 # 03 Y:2008 03 2008 REPAIR OR REPLACE STEAM TRAPS $5,490 $5,600 Not Implemented
UW0016 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $7,000 $500 Implemented
UW0016 # 05 Y:2008 05 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,625 $8,550 Implemented
UW0016 # 06 Y:2008 06 2008 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,510 $10 Not Implemented
UW0016 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $892 $0 Not Implemented
SF0355 # 01 Y:2008 01 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $904 $1,040 Implemented
SF0355 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,950 $26,488 Implemented
SF0355 # 03 Y:2008 03 2008 RECOVER WASTE HEAT FROM EQUIPMENT $25,511 $50,000 Not Implemented
SF0355 # 04 Y:2008 04 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $282 $1,174 Implemented
SF0355 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $422 $4,836 Not Implemented