IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0346 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,108 $3,480 Implemented
MI0346 # 05 Y:2019 05 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,147 $40,000 Implemented
MI0346 # 06 Y:2019 06 2019 INCREASE EFFICIENCY OF TRUCKS $3,675 $4,060 Not Implemented
MI0346 # 07 Y:2019 07 2019 COMBINE UTILITY METERS $730 $240 Implemented
MI0346 # 08 Y:2019 08 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $510 $165 Implemented
MI0346 # 09 Y:2019 09 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $308 $395 Not Implemented
MI0309 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $16,370 $1,640 Implemented
MI0309 # 02 Y:2017 02 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $13,394 $34,000 Implemented
MI0309 # 03 Y:2017 03 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,478 $320 Implemented
MI0309 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $4,544 $1,640 Implemented
MI0309 # 05 Y:2017 05 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,389 $1,729 Implemented
MI0309 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,090 $1,882 Implemented
MI0309 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,772 $6,223 Implemented
MI0309 # 08 Y:2017 08 2017 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $649 $210 Implemented
MI0309 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $307 $1,591 Implemented
UF0426 # 01 Y:2009 01 2009 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $20,276 $4,000 Not Implemented
UF0426 # 02 Y:2009 02 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $146,810 $3,192 Not Implemented
UF0426 # 03 Y:2009 03 2009 RECYCLE FLUORESCENT LAMPS $328 $3,405 Not Implemented
UF0426 # 04 Y:2009 04 2009 INSTALL SKYLIGHTS $2,555 $238 Implemented
UF0426 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $1,764 $481 Not Implemented
UF0426 # 06 Y:2009 06 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $50,000 $25,000 Not Implemented
UF0426 # 07 Y:2009 07 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,382 $2,382 Not Implemented
UF0426 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234,287 $67,220 Not Implemented
UF0426 # 09 Y:2009 09 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,528 $628 Implemented
UF0426 # 10 Y:2009 10 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,591 $568 Not Implemented