IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

101

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0439 # 03 Y:2003 03 2003 REDUCE OR ELIMINATE WASTE $36,600 $220 Implemented
AM0439 # 04 Y:2003 04 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $31,700 $270 Implemented
AM0439 # 05 Y:2003 05 2003 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,600 $500 Implemented
AM0439 # 06 Y:2003 06 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,200 $7,600 Implemented
AM0439 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,400 $1,000 Implemented
AM0439 # 08 Y:2003 08 2003 REPAIR OR REPLACE STEAM TRAPS $7,600 $1,120 Implemented
AM0439 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $4,890 $550 Implemented
AM0439 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,500 $980 Implemented
AM0439 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,290 $1,460 Implemented
AM0439 # 12 Y:2003 12 2003 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,140 $400 Implemented
TA0050 # 01 Y:2003 01 2003 UPGRADE CONVEYORS $430,950 $202,900 Not Implemented
TA0050 # 02 Y:2003 02 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $47,100 $5,202 Implemented
TA0050 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,258 $8,100 Implemented
TA0050 # 04 Y:2003 04 2003 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $13,150 $0 Not Implemented
TA0050 # 05 Y:2003 05 2003 UPGRADE OBSOLETE EQUIPMENT $5,795 $11,200 Implemented
TA0050 # 06 Y:2003 06 2003 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,492 $0 Not Implemented
TA0050 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,570 $0 Implemented
TA0050 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,676 $0 Implemented
TA0050 # 09 Y:2003 09 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $390 $0 Not Implemented
TA0050 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $390 $0 Implemented
KG0026 # 01 Y:1995 01 1995 HEAT WATER WITH EXHAUST HEAT $14,224 $2,500 Implemented
KG0026 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,694 $0 Implemented
KG0026 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,123 $1,850 Implemented
KG0026 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,076 $183 Implemented
KG0026 # 05 Y:1995 05 1995 INSTALL TIMERS AND/OR THERMOSTATS $823 $300 Implemented