IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0203 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $750 $1,400 Implemented
CO0203 # 07 Y:1991 07 1991 HEAT WATER WITH EXHAUST HEAT $4,300 $11,000 Implemented
CO0203 # 08 Y:1991 08 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,400 $2,000 Implemented
CO0203 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $5,600 Implemented
CO0203 # 10 Y:1991 10 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $700 Implemented
CO0203 # 11 Y:1991 11 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $400 $1,500 Implemented
CO0203 # 12 Y:1991 12 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $840 $1,300 Implemented
CO0203 # 13 Y:1991 13 1991 INSTALL TIMERS AND/OR THERMOSTATS $660 $900 Implemented
CO0203 # 14 Y:1991 14 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $200 Implemented
CO0203 # 15 Y:1991 15 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,000 $1,700 Implemented
CO0203 # 16 Y:1991 16 1991 INSULATE BARE EQUIPMENT $1,300 $1,800 Implemented
CO0059 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,952 $300 Implemented
CO0059 # 02 Y:1986 02 1986 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $6,532 $12,000 Not Implemented
CO0059 # 03 Y:1986 03 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,339 $800 Not Implemented
CO0059 # 04 Y:1986 04 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $667 $150 Implemented
CO0059 # 05 Y:1986 05 1986 RECOVER WASTE HEAT FROM EQUIPMENT $877 $400 Not Implemented
CO0059 # 06 Y:1986 06 1986 IMPROVE LUBRICATION PRACTICES $621 $0 Not Implemented
CO0059 # 07 Y:1986 07 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $314 $50 Implemented
CO0059 # 08 Y:1986 08 1986 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,338 $160 Implemented
CO0059 # 09 Y:1986 09 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $770 $1,380 Not Implemented
CO0059 # 10 Y:1986 10 1986 INSTALL TIMERS AND/OR THERMOSTATS $5,248 $55 Implemented
CO0059 # 11 Y:1986 11 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $740 $655 Implemented
CO0028 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,738 $620 Implemented
CO0028 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,873 $150,000 Implemented
CO0028 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,370 $10,000 Implemented