Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,498
matching recommendationsSIC | 2099 | Food Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0254 # 02 Y:1985 | 02 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,886 | $0 | Implemented |
TN0254 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $1,522 | $754 | Not Implemented |
TN0254 # 04 Y:1985 | 04 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,399 | $0 | Not Implemented |
TN0254 # 05 Y:1985 | 05 | 1985 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $686 | $163 | Not Implemented |
TN0254 # 06 Y:1985 | 06 | 1985 | USE MINIMUM STEAM OPERATING PRESSURE | $595 | $0 | Implemented |
TN0254 # 07 Y:1985 | 07 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $967 | $225 | Implemented |
TN0254 # 08 Y:1985 | 08 | 1985 | INSULATE BARE EQUIPMENT | $197 | $117 | Implemented |
UD0166 # 01 Y:1985 | 01 | 1985 | RECOVER AND REUSE COOLING WATER | $10,849 | $7,160 | Implemented |
UD0166 # 02 Y:1985 | 02 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,600 | $40,000 | Implemented |
UD0166 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,258 | $50,000 | Implemented |
CO0028 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,738 | $620 | Implemented |
CO0028 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,873 | $150,000 | Implemented |
CO0028 # 03 Y:1985 | 03 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,370 | $10,000 | Implemented |
CO0028 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $653 | $300 | Implemented |
CO0028 # 05 Y:1985 | 05 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $264 | $2,000 | Implemented |
CO0028 # 06 Y:1985 | 06 | 1985 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $2,158 | $5,000 | Implemented |
CO0028 # 07 Y:1985 | 07 | 1985 | INSULATE BARE EQUIPMENT | $1,600 | $3,000 | Not Implemented |
CO0028 # 08 Y:1985 | 08 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,611 | $1,140 | Implemented |
KU0156 # 01 Y:1985 | 01 | 1985 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $93,873 | $350,000 | Not Implemented |
KU0156 # 02 Y:1985 | 02 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,544 | $3,342 | Implemented |
KU0156 # 03 Y:1985 | 03 | 1985 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $6,350 | $2,500 | Not Implemented |
KU0156 # 04 Y:1985 | 04 | 1985 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $1,428 | $2,000 | Not Implemented |
KU0156 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,064 | $2,200 | Implemented |
KU0156 # 06 Y:1985 | 06 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $5,611 | $1,200 | Implemented |
KU0156 # 07 Y:1985 | 07 | 1985 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,298 | $1,200 | Implemented |