IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2207 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $112 Implemented
UW2207 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,582 $12,124 Not Implemented
UW2207 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,161 $0 Implemented
UW2207 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,631 $2,080 Implemented
BS0131 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $442 $300 Not Implemented
BS0131 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,392 $1,030 Not Implemented
BS0131 # 05 Y:2019 05 2019 INSTALL TIMERS AND/OR THERMOSTATS $217 $170 Not Implemented
BS0131 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $412 Not Implemented
BS0131 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $472 $295 Not Implemented
BS0131 # 02 Y:2019 02 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $79 $38 Not Implemented
BS0073 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,122 $220 Not Implemented
BS0073 # 06 Y:2016 06 2016 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $582 $316 Not Implemented
BS0073 # 07 Y:2016 07 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,966 $15,800 Not Implemented
BS0073 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $108 $47 Not Implemented
BS0073 # 03 Y:2016 03 2016 USE OPTIMUM TEMPERATURE $419 $116 Not Implemented
BS0073 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $506 $960 Not Implemented
BS0073 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,312 Not Implemented
BS0020 # 01 Y:2013 01 2013 REDESIGN PROCESS $15,024 $15,359 Not Implemented
BS0020 # 06 Y:2013 06 2013 COVER OPEN TANKS $3,845 $6,050 Not Implemented
BS0020 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $9,887 $5,300 Implemented
BS0020 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,831 $15,600 Implemented
BS0020 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,893 $71,307 Implemented
BS0020 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $18,318 $19,262 Implemented
OR0484 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $847 $1,013 Implemented
OR0484 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,710 $400 Not Implemented