matching recommendationsSIC | 2099 | Food Preparations, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0166 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,258 | $50,000 | Implemented |
UD0166 # 02 Y:1985 | 02 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $28,600 | $40,000 | Implemented |
UD0166 # 01 Y:1985 | 01 | 1985 | RECOVER AND REUSE COOLING WATER | $10,849 | $7,160 | Implemented |
TN0254 # 08 Y:1985 | 08 | 1985 | INSULATE BARE EQUIPMENT | $197 | $117 | Implemented |
TN0254 # 07 Y:1985 | 07 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $967 | $225 | Implemented |
TN0254 # 06 Y:1985 | 06 | 1985 | USE MINIMUM STEAM OPERATING PRESSURE | $595 | $0 | Implemented |
TN0254 # 05 Y:1985 | 05 | 1985 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $686 | $163 | Not Implemented |
TN0254 # 04 Y:1985 | 04 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,399 | $0 | Not Implemented |
TN0254 # 03 Y:1985 | 03 | 1985 | INSULATE BARE EQUIPMENT | $1,522 | $754 | Not Implemented |
TN0254 # 02 Y:1985 | 02 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,886 | $0 | Implemented |
TN0254 # 01 Y:1985 | 01 | 1985 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $3,422 | $1,042 | Implemented |
CO0028 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,873 | $150,000 | Implemented |
CO0028 # 01 Y:1985 | 01 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,738 | $620 | Implemented |
CO0028 # 03 Y:1985 | 03 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,370 | $10,000 | Implemented |
CO0028 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $653 | $300 | Implemented |
CO0028 # 05 Y:1985 | 05 | 1985 | AIR CONDITION ONLY SPACE NECESSARY | $264 | $2,000 | Implemented |
CO0028 # 06 Y:1985 | 06 | 1985 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $2,158 | $5,000 | Implemented |
CO0028 # 07 Y:1985 | 07 | 1985 | INSULATE BARE EQUIPMENT | $1,600 | $3,000 | Not Implemented |
CO0028 # 08 Y:1985 | 08 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,611 | $1,140 | Implemented |
KU0156 # 02 Y:1985 | 02 | 1985 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $9,544 | $3,342 | Implemented |
KU0156 # 01 Y:1985 | 01 | 1985 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $93,873 | $350,000 | Not Implemented |
KU0156 # 05 Y:1985 | 05 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,064 | $2,200 | Implemented |
KU0156 # 03 Y:1985 | 03 | 1985 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $6,350 | $2,500 | Not Implemented |
KU0156 # 04 Y:1985 | 04 | 1985 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $1,428 | $2,000 | Not Implemented |
KU0156 # 11 Y:1985 | 11 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $141 | $40 | Not Implemented |