IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0014 # 02 Y:1991 02 1991 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $787 $100 Not Implemented
IA0014 # 01 Y:1991 01 1991 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,760 $1,000 Not Implemented
IA0014 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $403 $1,768 Not Implemented
IA0014 # 04 Y:1991 04 1991 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,788 $6,475 Not Implemented
IA0014 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,361 $600 Not Implemented
IA0014 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $554 $0 Not Implemented
WI0131 # 03 Y:1991 03 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $249 $0 Not Implemented
WI0131 # 01 Y:1991 01 1991 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $73,453 $200,000 Not Implemented
WI0131 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,715 $0 Not Implemented
WI0131 # 12 Y:1991 12 1991 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $353 $0 Not Implemented
WI0131 # 04 Y:1991 04 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,538 $0 Not Implemented
WI0131 # 05 Y:1991 05 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,206 $5,000 Not Implemented
WI0131 # 06 Y:1991 06 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,976 $4,900 Not Implemented
WI0131 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,759 $1,920 Not Implemented
WI0131 # 08 Y:1991 08 1991 INSULATE BARE EQUIPMENT $1,012 $1,520 Not Implemented
WI0131 # 09 Y:1991 09 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $120 $1,774 Not Implemented
WI0131 # 10 Y:1991 10 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $713 $0 Not Implemented
WI0131 # 11 Y:1991 11 1991 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $499 $700 Not Implemented
MO0040 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,811 $1,781 Not Implemented
MO0040 # 02 Y:1991 02 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,158 $1,000 Not Implemented
MO0040 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $261 $0 Not Implemented
MO0040 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $221 $1,032 Not Implemented
MO0040 # 05 Y:1991 05 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,207 $1,195 Not Implemented
CO0203 # 11 Y:1991 11 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $400 $1,500 Implemented
CO0203 # 01 Y:1991 01 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $31,100 $0 Implemented