IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0257 # 08 Y:1992 08 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,020 $6,500 Implemented
CO0257 # 01 Y:1992 01 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,300 $250 Implemented
CO0257 # 02 Y:1992 02 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,490 $30 Implemented
CO0257 # 03 Y:1992 03 1992 REDUCE VENTILATION AIR $1,270 $200 Implemented
CO0257 # 04 Y:1992 04 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,430 $1,000 Implemented
CO0257 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $4,910 Implemented
CO0257 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,350 $12,990 Implemented
CO0257 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,240 $7,670 Implemented
AS0060 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $3,687 $91,000 Not Implemented
AS0060 # 02 Y:1992 02 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,884 $4,112 Not Implemented
AS0060 # 03 Y:1992 03 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $326 $600 Not Implemented
AS0060 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,371 $2,875 Not Implemented
AS0060 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $273 $5,904 Not Implemented
AS0060 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $486 $750 Not Implemented
AS0060 # 07 Y:1992 07 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,703 $700 Not Implemented
AS0060 # 08 Y:1992 08 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $442 $2,036 Not Implemented
AS0060 # 09 Y:1992 09 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $638 $300 Not Implemented
AS0060 # 10 Y:1992 10 1992 IMPROVE LUBRICATION PRACTICES $479 $546 Not Implemented
AM0145 # 02 Y:1992 02 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,000 $4,000 Implemented
AM0145 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $215 $155 Implemented
AM0145 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24 $1,240 Implemented
AM0145 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $208 $270 Implemented
AM0145 # 01 Y:1992 01 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $11,180 $7,575 Implemented
CO0237 # 05 Y:1992 05 1992 USE MINIMUM SAFE OVEN VENTILATION $340 $750 Implemented
CO0237 # 06 Y:1992 06 1992 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $600 $0 Implemented