IAC logo
IAC Assessment: CO0257
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0257
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1992
Principal Product Packaged Tea
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 155,800
Annual Production 3,200,000 Pieces
Production Hrs. Annual 5,425
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $178,375 3,041,325 kWh $0.06
Natural Gas $10,611 2,640 MMBtu $4.02
TOTAL ENERGY COSTS $188,986
RECOMMENDED SAVINGS* $20,500 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,500
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$5,300
Cost:
$250
- - - - $5,300 - -
-
kWh
-
-
MMBtu
$5,300
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,490
Cost:
$30
$800 31,067 $690 171 - - $800
31,067
kWh
$690
171
MMBtu
-
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$1,270
Cost:
$200
$140 2,345 $1,130 281 - - $140
2,345
kWh
$1,130
281
MMBtu
-
-
$
04: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$1,430
Cost:
$1,000
- - $1,430 357 - - -
-
kWh
$1,430
357
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,400
Cost:
$4,910
$1,400 69,754 - - - - $1,400
69,754
kWh
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,350
Cost:
$12,990
$3,350 57,151 - - - - $3,350
57,151
kWh
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,240
Cost:
$7,670
$4,240 72,392 - - - - $4,240
72,392
kWh
-
-
MMBtu
-
-
$
08: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,020
Cost:
$6,500
- - - - $2,020 - -
-
kWh
-
-
MMBtu
$2,020
-
$
TOTAL RECOMMENDED Savings:
$20,500
Cost:
$33,550
$9,930 232,709 $3,250 809 $7,320 - $9,930
232,709
kWh
$3,250
809
MMBtu
$7,320
-
$
TOTAL IMPLEMENTED Savings:
$20,500
Cost:
$33,550
$9,930 232,709 $3,250 809 $7,320 - $9,930
232,709
kWh
$3,250
809
MMBtu
$7,320
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes