IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0563 # 02 Y:1995 02 1995 RECOVER AND REUSE COOLING WATER $37,645 $14,400 Not Implemented
GT0563 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,290 $61,590 Not Implemented
GT0563 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,710 $25,040 Not Implemented
GT0563 # 05 Y:1995 05 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,150 $0 Not Implemented
GT0563 # 01 Y:1995 01 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $38,980 $40,300 Not Implemented
KG0026 # 05 Y:1995 05 1995 INSTALL TIMERS AND/OR THERMOSTATS $823 $300 Implemented
KG0026 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $494 $20 Implemented
KG0026 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $605 $375 Implemented
KG0026 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,076 $183 Implemented
KG0026 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,123 $1,850 Implemented
KG0026 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,694 $0 Implemented
KG0026 # 01 Y:1995 01 1995 HEAT WATER WITH EXHAUST HEAT $14,224 $2,500 Implemented
SF0052 # 07 Y:1995 07 1995 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $71,273 $230,000 Not Implemented
SF0052 # 06 Y:1995 06 1995 OPTIMIZE PLANT POWER FACTOR $2,861 $5,341 Not Implemented
SF0052 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $830 $1,650 Implemented
SF0052 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $808 $1,116 Implemented
SF0052 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,925 $13,715 Implemented
SF0052 # 02 Y:1995 02 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $826 $2,750 Not Implemented
SF0052 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $390 $1,548 Not Implemented
UL0119 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $40 Implemented
UL0119 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $477 $529 Implemented
OD0020 # 05 Y:1995 05 1995 ISOLATE HOT OR COLD EQUIPMENT $1,080 $527 Not Implemented
OD0020 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $384 $600 Not Implemented
OD0020 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,543 $200 Implemented
OD0020 # 02 Y:1995 02 1995 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $7,452 $0 Not Implemented