IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 2099 Food Preparations, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0811 # 08 Y:2005 08 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $162,720 $25,000 Not Implemented
GT0811 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,119 $5,334 Not Implemented
GT0811 # 06 Y:2005 06 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,877 $1,300 Implemented
GT0811 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,312 $750 Implemented
GT0811 # 01 Y:2005 01 2005 IMPROVE LUBRICATION PRACTICES $3,405 $0 Implemented
GT0811 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,824 $20,700 Implemented
GT0811 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,607 $6,694 Not Implemented
GT0811 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,135 $3,000 Implemented
MS0285 # 01 Y:2005 01 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $147,024 $1,342,000 Not Implemented
MS0285 # 02 Y:2005 02 2005 INSTALL TIMERS AND/OR THERMOSTATS $11,445 $575 Not Implemented
MS0285 # 03 Y:2005 03 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,503 $138 Implemented
MS0285 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,062 $151 Implemented
MS0285 # 05 Y:2005 05 2005 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $671 $972 Not Implemented
LE0216 # 01 Y:2005 01 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,847 $1,200 Not Implemented
LE0216 # 02 Y:2005 02 2005 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,467 $4,000 Not Implemented
LE0216 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,748 $2,000 Not Implemented
LE0216 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,613 $320 Not Implemented
LE0216 # 05 Y:2005 05 2005 USE SYNTHETIC LUBRICANT $429 $200 Not Implemented
LE0216 # 06 Y:2005 06 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,078 $110 Not Implemented
LE0216 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,315 $40,077 Not Implemented
OR0484 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $847 $1,013 Implemented
OR0484 # 01 Y:2005 01 2005 USE RADIANT HEATER FOR SPOT HEATING $41,089 $40,143 Not Implemented
OR0484 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,710 $400 Not Implemented
OK0706 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $821 $605 Not Implemented
OK0706 # 01 Y:2005 01 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $10,579 $1,500 Implemented