Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,239
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0053 # 04 Y:1995 | 04 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $495 | $150 | Implemented |
NC0053 # 05 Y:1995 | 05 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,991 | $3,790 | Implemented |
NC0053 # 06 Y:1995 | 06 | 1995 | INSULATE BARE EQUIPMENT | $1,717 | $248 | Implemented |
GT0552 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,000 | $208,000 | Implemented |
GT0552 # 02 Y:1995 | 02 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,400 | $0 | Implemented |
GT0552 # 03 Y:1995 | 03 | 1995 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $77,800 | $200,000 | Not Implemented |
GT0552 # 04 Y:1995 | 04 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $575 | $191 | Implemented |
GT0552 # 05 Y:1995 | 05 | 1995 | REPAIR AND ELIMINATE STEAM LEAKS | $4,890 | $500 | Implemented |
NC0051 # 01 Y:1995 | 01 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,276 | $570 | Not Implemented |
NC0051 # 02 Y:1995 | 02 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,978 | $420 | Implemented |
NC0051 # 03 Y:1995 | 03 | 1995 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,450 | $12,000 | Not Implemented |
NC0051 # 04 Y:1995 | 04 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,438 | $4,430 | Implemented |
NC0051 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,206 | $1,960 | Not Implemented |
NC0051 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,236 | $3,200 | Not Implemented |
NC0051 # 07 Y:1995 | 07 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,190 | $0 | Implemented |
NC0051 # 08 Y:1995 | 08 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $24,714 | $18,000 | Not Implemented |
NC0051 # 09 Y:1995 | 09 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,325 | $3,800 | Not Implemented |
ME0155 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,097 | $20,385 | Implemented |
ME0155 # 02 Y:1995 | 02 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $12,904 | $20,000 | Implemented |
ME0155 # 03 Y:1995 | 03 | 1995 | CLOSE OFF UNNEEDED STEAM LINES | $1,120 | $200 | Implemented |
ME0155 # 04 Y:1995 | 04 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $952 | $350 | Implemented |
ME0155 # 05 Y:1995 | 05 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $907 | $400 | Implemented |
ME0155 # 06 Y:1995 | 06 | 1995 | USE OPTIMUM THICKNESS INSULATION | $772 | $130 | Implemented |
AM0237 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,890 | $5,000 | Implemented |
AM0237 # 02 Y:1995 | 02 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,400 | $41 | Implemented |