IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0053 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $495 $150 Implemented
NC0053 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,991 $3,790 Implemented
NC0053 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $1,717 $248 Implemented
GT0552 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,000 $208,000 Implemented
GT0552 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,400 $0 Implemented
GT0552 # 03 Y:1995 03 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $77,800 $200,000 Not Implemented
GT0552 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $575 $191 Implemented
GT0552 # 05 Y:1995 05 1995 REPAIR AND ELIMINATE STEAM LEAKS $4,890 $500 Implemented
NC0051 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,276 $570 Not Implemented
NC0051 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,978 $420 Implemented
NC0051 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,450 $12,000 Not Implemented
NC0051 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,438 $4,430 Implemented
NC0051 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,206 $1,960 Not Implemented
NC0051 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,236 $3,200 Not Implemented
NC0051 # 07 Y:1995 07 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,190 $0 Implemented
NC0051 # 08 Y:1995 08 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $24,714 $18,000 Not Implemented
NC0051 # 09 Y:1995 09 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,325 $3,800 Not Implemented
ME0155 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,097 $20,385 Implemented
ME0155 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,904 $20,000 Implemented
ME0155 # 03 Y:1995 03 1995 CLOSE OFF UNNEEDED STEAM LINES $1,120 $200 Implemented
ME0155 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $952 $350 Implemented
ME0155 # 05 Y:1995 05 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $907 $400 Implemented
ME0155 # 06 Y:1995 06 1995 USE OPTIMUM THICKNESS INSULATION $772 $130 Implemented
AM0237 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,890 $5,000 Implemented
AM0237 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,400 $41 Implemented