Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,239
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0821 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,991 | $23,275 | Not Implemented |
MA0821 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $997 | $1,400 | Not Implemented |
MA0821 # 04 Y:2020 | 04 | 2020 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $490 | $1,785 | Not Implemented |
LE0487 # 01 Y:2020 | 01 | 2020 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $728 | $40 | Implemented |
LE0487 # 02 Y:2020 | 02 | 2020 | INSULATE BARE EQUIPMENT | $5,562 | $1,833 | Implemented |
LE0487 # 03 Y:2020 | 03 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $11,267 | $5,000 | Implemented |
LE0487 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,594 | $10,000 | Not Implemented |
LE0487 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,823 | $10,000 | Implemented |
LE0487 # 06 Y:2020 | 06 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $399 | $975 | Implemented |
LE0487 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,408 | $16,552 | Implemented |
LE0487 # 08 Y:2020 | 08 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $27,628 | $85,000 | Not Implemented |
LE0487 # 09 Y:2020 | 09 | 2020 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $4,451 | $15,000 | Implemented |
LE0487 # 10 Y:2020 | 10 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,832 | $8,000 | Implemented |
LE0487 # 11 Y:2020 | 11 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,929 | $30,000 | Implemented |
GT0933 # 01 Y:2019 | 01 | 2019 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $10,455 | $250 | Implemented |
GT0933 # 02 Y:2019 | 02 | 2019 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $23,854 | $13,713 | Not Implemented |
GT0933 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $199 | $213 | Implemented |
GT0933 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $32,851 | $41,392 | Implemented |
GT0933 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $4,386 | $6,741 | Not Implemented |
GT0933 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,768 | $9,616 | Implemented |
GT0933 # 07 Y:2019 | 07 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $71,526 | $507,835 | Not Implemented |
GT0932 # 01 Y:2019 | 01 | 2019 | REPAIR AND ELIMINATE STEAM LEAKS | $2,019 | $500 | Implemented |
GT0932 # 02 Y:2019 | 02 | 2019 | INSULATE BARE EQUIPMENT | $495 | $382 | Implemented |
GT0932 # 03 Y:2019 | 03 | 2019 | INSTALL OCCUPANCY SENSORS | $1,606 | $1,689 | Not Implemented |
GT0932 # 04 Y:2019 | 04 | 2019 | INSULATE BARE EQUIPMENT | $4,768 | $5,877 | Implemented |