IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0070 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,251 $4,495 Not Implemented
HO0070 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,327 $1,200 Not Implemented
HO0070 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $305 $80 Not Implemented
HO0070 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $467 $472 Not Implemented
HO0070 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $139 $375 Not Implemented
ME0127 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,325 $3,090 Not Implemented
ME0127 # 02 Y:1994 02 1994 COVER OPEN TANKS $4,708 $1,600 Implemented
ME0127 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $328 $100 Implemented
ME0127 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,963 $400 Implemented
ME0127 # 05 Y:1994 05 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $565 $225 Not Implemented
TN0511 # 01 Y:1994 01 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $64,659 $115,952 n/a
TN0511 # 02 Y:1994 02 1994 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $24,016 $0 n/a
TN0511 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,557 $7,667 n/a
TN0511 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,554 $2,285 n/a
TN0511 # 05 Y:1994 05 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $6,734 $0 n/a
TN0511 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,664 $480 n/a
TN0511 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,278 $4,000 n/a
TN0511 # 08 Y:1994 08 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,576 $1,040 n/a
MA0296 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $48,128 $7,677 Not Implemented
MA0296 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,136 $10,870 Not Implemented
MA0296 # 03 Y:1994 03 1994 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $6,909 $20,205 Not Implemented
MA0296 # 04 Y:1994 04 1994 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,525 $7,280 Not Implemented
MA0296 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,714 $0 Implemented
MA0296 # 06 Y:1994 06 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,786 $1,786 Not Implemented
MA0296 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $881 $121 Not Implemented