IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0296 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $514 $644 Implemented
MA0296 # 09 Y:1994 09 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $303 $688 Not Implemented
ME0124 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,318 $2,800 Not Implemented
ME0124 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $4,574 $9,200 Not Implemented
ME0124 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,730 $200 Not Implemented
ME0124 # 04 Y:1994 04 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,717 $4,300 Not Implemented
ME0124 # 05 Y:1994 05 1994 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $54,000 $110,000 Not Implemented
ME0124 # 06 Y:1994 06 1994 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,980 $18,000 Not Implemented
ME0124 # 07 Y:1994 07 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,767 $9,000 Not Implemented
GT0515 # 01 Y:1993 01 1993 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,130 $9,570 Not Implemented
GT0515 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,090 $0 Not Implemented
GT0515 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $500 Implemented
GT0515 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,260 $14,500 Not Implemented
GT0515 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,620 $100,640 Not Implemented
GT0515 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $45,330 $32,700 Not Implemented
GT0515 # 07 Y:1993 07 1993 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,650 $6,560 Not Implemented
GT0515 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,820 $80,090 Implemented
ME0115 # 01 Y:1993 01 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,628 $800 Not Implemented
ME0115 # 02 Y:1993 02 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $106,916 $100,000 Not Implemented
ME0115 # 03 Y:1993 03 1993 OPTIMIZE PLANT POWER FACTOR $1,882 $2,500 Not Implemented
ME0115 # 04 Y:1993 04 1993 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,080 $3,000 Not Implemented
ME0115 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $965 $100 Implemented
ME0115 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,600 $2,000 Implemented
ME0115 # 07 Y:1993 07 1993 PAY UTILITY BILLS ON TIME $3,042 $0 Not Implemented
SD0068 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $731 $750 Implemented