IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0921 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $947 $3,500 Implemented
GT0921 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,972 $32,568 Not Implemented
TT0216 # 01 Y:2019 01 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,451 $2,000 Not Implemented
TT0216 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $14,507 $20,000 Implemented
TT0216 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,494 $3,750 Implemented
TT0216 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $1,254 $1,710 Implemented
TT0216 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,220 $20 Implemented
TT0216 # 06 Y:2019 06 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,054 $3,559 Implemented
TT0216 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $386 $1,530 Implemented
NC0625 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,633 $59,736 Implemented
NC0625 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,983 $428 Implemented
NC0625 # 03 Y:2019 03 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,098 $50,000 Implemented
NC0625 # 04 Y:2019 04 2019 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,107 $3,000 Not Implemented
NC0625 # 05 Y:2019 05 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,120 $5,000 Not Implemented
GT0920 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,551 $629 Implemented
GT0920 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $5,826 $1,645 Implemented
GT0920 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $360 $386 Implemented
GT0920 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,465 $3,500 Implemented
GT0920 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,569 $5,081 Implemented
MI0341 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $142,227 $2,030 Not Implemented
MI0341 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $75,087 $115,295 Not Implemented
MI0341 # 03 Y:2018 03 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $69,002 $300,000 Not Implemented
MI0341 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $59,009 $48,268 Not Implemented
MI0341 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,949 $6,410 Not Implemented
MI0341 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,910 $35,323 Not Implemented