IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0784 # 03 Y:2009 03 2009 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $11,003 $0 Not Implemented
OK0784 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $1,600 $620 Not Implemented
OK0784 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $362 $1,013 Not Implemented
OK0784 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $888 $1,098 Not Implemented
OK0784 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,104 $0 Implemented
OK0784 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,788 $0 Implemented
OK0784 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $858 $990 Implemented
MA0653 # 01 Y:2009 01 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $110,550 $270,000 Not Implemented
MA0653 # 02 Y:2009 02 2009 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $37,210 $68,000 Not Implemented
MA0653 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $16,188 $752 Implemented
MA0653 # 04 Y:2009 04 2009 CLOSE OFF UNNEEDED STEAM LINES $3,551 $500 Not Implemented
MA0653 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,840 $7,510 Implemented
MA0653 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,375 $6,125 Not Implemented
GT0867 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,318 $89,971 Not Implemented
GT0867 # 02 Y:2009 02 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,794 $4,000 Implemented
GT0867 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,426 $3,250 Implemented
GT0867 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,518 $6,000 Implemented
GT0867 # 05 Y:2009 05 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,949 $0 Not Implemented
GT0867 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,440 $0 Implemented
LE0291 # 01 Y:2009 01 2009 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $32,078 $50,000 Not Implemented
LE0291 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,489 $510 Not Implemented
LE0291 # 03 Y:2009 03 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,557 $2,500 Implemented
LE0291 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,457 $1,120 Implemented
LE0291 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,439 $1,600 Not Implemented
LE0291 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,837 $125 Not Implemented