IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,178

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0624 # 16 Y:2022 16 2022 INSULATE BARE EQUIPMENT $3,078 $3,446 Implemented
WV0624 # 15 Y:2022 15 2022 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $3,975 $11,340 Not Implemented
WV0624 # 14 Y:2022 14 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,241 $6,840 Implemented
WV0624 # 13 Y:2022 13 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,157 $6,050 Implemented
WV0624 # 12 Y:2022 12 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,615 $6,090 Not Implemented
WV0624 # 11 Y:2022 11 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $6,371 $1,500 Implemented
WV0624 # 10 Y:2022 10 2022 DEVELOP A REPAIR/REPLACE POLICY $6,918 $2,242 Implemented
WV0624 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,209 $15,750 Not Implemented
WV0624 # 08 Y:2022 08 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $16,511 $450 Implemented
WV0624 # 07 Y:2022 07 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,225 $2,763 Implemented
WV0624 # 06 Y:2022 06 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $33,682 $7,000 Implemented
WV0624 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $39,601 $115,224 Not Implemented
WV0624 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,261 $53,185 Not Implemented
WV0624 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,923 $170,200 Not Implemented
WV0624 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $59,403 $137,330 Not Implemented
WV0624 # 01 Y:2022 01 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $194,747 $906,700 Not Implemented
UA0250 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,394 $34,200 Implemented
UA0250 # 02 Y:2021 02 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,021 $25,035 Not Implemented
UA0250 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,508 $4,445 Implemented
UA0250 # 04 Y:2021 04 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $19,724 $5,000 Implemented
UA0250 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,015 $30,617 Implemented
UA0250 # 06 Y:2021 06 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,456 $450 Implemented
UA0250 # 07 Y:2021 07 2021 OPTIMIZE PLANT POWER FACTOR $43,918 $57,938 Implemented
UA0245 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,808 $43,308 Not Implemented
UA0245 # 02 Y:2021 02 2021 USE PHOTOCELL CONTROLS $323 $197 Not Implemented