Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,239
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0014 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,768 | $1,000 | n/a |
CC0014 # 02 Y:2023 | 02 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,788 | $800 | n/a |
CC0014 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,512 | $1,000 | n/a |
KS2313 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,144 | $514,950 | Not Implemented |
KS2313 # 05 Y:2023 | 05 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $106,263 | $627,000 | Not Implemented |
KS2313 # 04 Y:2023 | 04 | 2023 | COMBINE UTILITY METERS | $11,545 | $33,000 | Implemented |
KS2313 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $28,388 | $6,340 | Not Implemented |
KS2313 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,937 | $60 | Implemented |
KS2313 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,149 | $29,920 | Implemented |
CM1017 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,638 | $57,344 | Implemented |
CM1017 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $738 | $0 | Implemented |
CM1017 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,890 | $15,750 | Implemented |
CM1017 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $20,045 | $41,481 | Implemented |
CM1017 # 05 Y:2023 | 05 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,538 | $4,396 | Implemented |
CM1017 # 06 Y:2023 | 06 | 2023 | INSTALL SYSTEM TO COLLECT SCRAP | $9,880 | $2,306 | Not Implemented |
CM1017 # 07 Y:2023 | 07 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,464 | $3,500 | Implemented |
UW2301 # 05 Y:2023 | 05 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,590 | $77,405 | Not Implemented |
UW2301 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $729 | $0 | Not Implemented |
UW2301 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,976 | $295 | Not Implemented |
UW2301 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $82 | $344 | Implemented |
UW2301 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,523 | $16,133 | Implemented |
KS2310 # 01 Y:2023 | 01 | 2023 | USE OPTIMUM THICKNESS INSULATION | $6,101 | $3,005 | Implemented |
KS2310 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,786 | $5,960 | Not Implemented |
KS2310 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,134 | $60 | Not Implemented |
KS2310 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $264 | $236 | Not Implemented |