IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0523 # 05 Y:1997 05 1997 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,478 $6,900 Implemented
OK0523 # 06 Y:1997 06 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,326 $1,658 Not Implemented
OK0523 # 07 Y:1997 07 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,077 $0 Implemented
MA0388 # 01 Y:1997 01 1997 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $95,807 $47,527 Implemented
MA0388 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,382 $1,100 Not Implemented
MA0388 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,884 $4,925 Implemented
MA0388 # 04 Y:1997 04 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $7,561 $18,983 Not Implemented
MA0388 # 05 Y:1997 05 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,406 $858 Not Implemented
MA0388 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $604 $272 Implemented
MA0388 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,002 $0 Implemented
MA0388 # 08 Y:1997 08 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $32,204 $55,094 Implemented
GT0612 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,557 $58,792 Not Implemented
GT0612 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,332 $900 Implemented
GT0612 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,254 $11,670 Not Implemented
GT0612 # 04 Y:1997 04 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $244,164 $4,200 Not Implemented
GT0612 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,009 $56,000 Not Implemented
GT0612 # 06 Y:1997 06 1997 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,690 $6,500 Implemented
GT0613 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,001 $14,704 Not Implemented
GT0613 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,120 $2,400 Implemented
GT0613 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,937 $23,844 Implemented
GT0613 # 04 Y:1997 04 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,741 $7,040 Not Implemented
GT0613 # 05 Y:1997 05 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $37,950 $53,500 Not Implemented
GT0613 # 06 Y:1997 06 1997 REPAIR OR REPLACE STEAM TRAPS $22,190 $1,800 Implemented
GT0613 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $9,100 $4,700 Implemented
GT0613 # 08 Y:1997 08 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,120,440 $1,500,000 Not Implemented