IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

98

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0016 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $36,111 $6,000 n/a
CI0016 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $175,385 $609,600 n/a
CI0016 # 07 Y:2023 07 2023 REPLACE BOILER $11,941 $45,000 n/a
CI0016 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,511 $0 n/a
CI0016 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,733 $6,270 n/a
CI0016 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $28,538 $5,000 n/a
CI0016 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $49,228 $6,000 n/a
CI0016 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,065 $1,500 n/a
SD0550 # 02 Y:2017 02 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $119,615 $210,000 Implemented
SD0550 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $526,998 $1,348,560 Not Implemented
SD0550 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,945 $600 Not Implemented
SD0550 # 05 Y:2017 05 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,077 $9,750 Not Implemented
SD0550 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,225 $2,500 Implemented
SD0504 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,360 $7,010 Not Implemented
SD0504 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,200 $12,725 Not Implemented
SD0504 # 03 Y:2010 03 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $14,846 $20,000 Not Implemented
SD0504 # 02 Y:2010 02 2010 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $188,550 $211,240 Not Implemented
SD0504 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,983 $11,585 Not Implemented
LM0121 # 01 Y:2006 01 2006 $183,000 $2,160 Not Implemented
LM0121 # 02 Y:2006 02 2006 $91,500 $200 Not Implemented
LM0121 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $3,734 $3,100 Implemented
LM0121 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,390 $10,233 Implemented
LM0058 # 05 Y:2003 05 2003 $20,000 $19,260 n/a
LM0058 # 03 Y:2003 03 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,012 $18,500 Not Implemented
LM0058 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,174 $250 Implemented