IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0784 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $888 $1,098 Not Implemented
OK0784 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $1,600 $620 Not Implemented
OK0784 # 02 Y:2009 02 2009 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $26,522 $23,859 Implemented
OK0784 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,104 $0 Implemented
OK0784 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $362 $1,013 Not Implemented
OK0784 # 01 Y:2009 01 2009 INSULATE BARE EQUIPMENT $32,802 $10,627 Implemented
OK0784 # 09 Y:2009 09 2009 INSTALL TIMERS AND/OR THERMOSTATS $858 $990 Implemented
OK0784 # 08 Y:2009 08 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,788 $0 Implemented
OK0784 # 03 Y:2009 03 2009 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $11,003 $0 Not Implemented
KU0414 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $148 $150 Not Implemented
KU0414 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $329 $30 Implemented
KU0414 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $453 $600 Implemented
KU0414 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,173 $832 Implemented
KU0414 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,703 $520 Not Implemented
KU0414 # 02 Y:1993 02 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,044 $1,000 Implemented
KU0414 # 01 Y:1993 01 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,468 $10,400 Not Implemented
OK0397 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,271 $2,404 Implemented
OK0397 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,531 $11,150 Implemented
OK0397 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,448 $3,185 Implemented
OK0397 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $502 $768 Not Implemented
OK0397 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $558 $0 Not Implemented
OK0397 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,633 $3,692 Implemented
KU0390 # 12 Y:1992 12 1992 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $1,696 $1,250 Implemented
KU0390 # 06 Y:1992 06 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,635 $5,600 Not Implemented
KU0390 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,643 $3,800 Implemented