Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0784 # 06 Y:2009 | 06 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $888 | $1,098 | Not Implemented |
OK0784 # 04 Y:2009 | 04 | 2009 | INSTALL OCCUPANCY SENSORS | $1,600 | $620 | Not Implemented |
OK0784 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $26,522 | $23,859 | Implemented |
OK0784 # 07 Y:2009 | 07 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,104 | $0 | Implemented |
OK0784 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $362 | $1,013 | Not Implemented |
OK0784 # 01 Y:2009 | 01 | 2009 | INSULATE BARE EQUIPMENT | $32,802 | $10,627 | Implemented |
OK0784 # 09 Y:2009 | 09 | 2009 | INSTALL TIMERS AND/OR THERMOSTATS | $858 | $990 | Implemented |
OK0784 # 08 Y:2009 | 08 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,788 | $0 | Implemented |
OK0784 # 03 Y:2009 | 03 | 2009 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $11,003 | $0 | Not Implemented |
KU0414 # 07 Y:1993 | 07 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $148 | $150 | Not Implemented |
KU0414 # 06 Y:1993 | 06 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $329 | $30 | Implemented |
KU0414 # 05 Y:1993 | 05 | 1993 | INSTALL OCCUPANCY SENSORS | $453 | $600 | Implemented |
KU0414 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,173 | $832 | Implemented |
KU0414 # 03 Y:1993 | 03 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,703 | $520 | Not Implemented |
KU0414 # 02 Y:1993 | 02 | 1993 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,044 | $1,000 | Implemented |
KU0414 # 01 Y:1993 | 01 | 1993 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,468 | $10,400 | Not Implemented |
OK0397 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,271 | $2,404 | Implemented |
OK0397 # 03 Y:1993 | 03 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $16,531 | $11,150 | Implemented |
OK0397 # 04 Y:1993 | 04 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,448 | $3,185 | Implemented |
OK0397 # 05 Y:1993 | 05 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $502 | $768 | Not Implemented |
OK0397 # 06 Y:1993 | 06 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $558 | $0 | Not Implemented |
OK0397 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,633 | $3,692 | Implemented |
KU0390 # 12 Y:1992 | 12 | 1992 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $1,696 | $1,250 | Implemented |
KU0390 # 06 Y:1992 | 06 | 1992 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,635 | $5,600 | Not Implemented |
KU0390 # 05 Y:1992 | 05 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,643 | $3,800 | Implemented |