Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0821 # 01 Y:2020 01 2020 USE MINIMUM SAFE OVEN VENTILATION $48,924 $61,470 Not Implemented
MA0821 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $23,275 Not Implemented
MA0821 # 04 Y:2020 04 2020 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $490 $1,785 Not Implemented
MA0821 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $997 $1,400 Not Implemented
MA0766 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,571 $1,000 Not Implemented
MA0766 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,210 $50,500 Implemented
MA0766 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,264 $57,500 Not Implemented
MA0766 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,855 $2,000 Implemented
MA0766 # 06 Y:2016 06 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $3,894 $2,462 Implemented
MA0766 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,247 $8,325 Not Implemented
MA0729 # 01 Y:2014 01 2014 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $25,718 $11,750 Not Implemented
MA0729 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,114 $9,050 Not Implemented
MA0729 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,173 $200 Implemented
MA0729 # 05 Y:2014 05 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $2,622 $2,690 Not Implemented
MA0729 # 02 Y:2014 02 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,490 $500 Implemented
MA0729 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,956 $3,300 Implemented
MAS033 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $1,224 $730 Not Implemented
MAS033 # 02 Y:2012 02 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,256 $34,000 Not Implemented
MAS033 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,549 $7,500 Implemented
MAS033 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $762 $3,450 Not Implemented
MA0671 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,328 $2,220 Not Implemented
MA0671 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $740 $200 Implemented
MA0671 # 03 Y:2011 03 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,556 $15,000 Not Implemented
MA0671 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $4,780 $3,550 Implemented
MA0671 # 01 Y:2011 01 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $36,635 $200,000 Not Implemented