IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

753

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2434 # 01 Y:2024 01 2024 REPAIR AND ELIMINATE STEAM LEAKS $2,723 $1,383 n/a
KS2434 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $48,853 $469,862 n/a
KS2434 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,537 $6,440 n/a
KS2434 # 05 Y:2024 05 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,512 $73,720 n/a
KS2434 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $13,772 $52,090 n/a
KS2434 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,889 $6,569 n/a
WV0614 # 02 Y:2021 02 2021 UPGRADE CONTROLS ON COMPRESSORS $37,679 $34,222 Not Implemented
WV0614 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,283 $450 Implemented
WV0614 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,396 $38,385 Implemented
WV0614 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $399,970 $573,165 Not Implemented
WV0614 # 05 Y:2021 05 2021 DEVELOP A REPAIR/REPLACE POLICY $7,526 $5,317 Implemented
WV0614 # 03 Y:2021 03 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $14,148 $1,000 Implemented
WV0614 # 08 Y:2021 08 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,815 $60 Implemented
WV0614 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,463 $2,884 Implemented
WV0614 # 09 Y:2021 09 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,124 $1,083 Implemented
NC0666 # 04 Y:2021 04 2021 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,768 $10,000 n/a
NC0666 # 02 Y:2021 02 2021 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $24,876 $50,000 n/a
NC0666 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,259 $50 n/a
NC0666 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,200 $51,808 n/a
CL2105 # 10 Y:2021 10 2021 REPLACE TREATED WATER WITH WELL / SURFACE WATER $2,591 $600 Implemented
CL2105 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,819 $2,100 Implemented
CL2105 # 11 Y:2021 11 2021 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $982 $3,050 Not Implemented
CL2105 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $69,993 $55,908 Implemented
CL2105 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $25,163 $8,200 Implemented
CL2105 # 03 Y:2021 03 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $34,939 $1,120 Not Implemented