IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0670 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $3,931 $7,260 Implemented
MA0670 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,994 $1,800 Implemented
MA0670 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $523 $1,000 Not Implemented
MA0670 # 01 Y:2011 01 2011 INSULATE BARE EQUIPMENT $11,262 $5,845 Implemented
MA0670 # 04 Y:2011 04 2011 USE MINIMUM SAFE OVEN VENTILATION $2,775 $6,150 Not Implemented
MA0534 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $19,634 $12,975 Not Implemented
MA0534 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,487 $53,950 Not Implemented
MA0534 # 02 Y:2003 02 2003 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $76,320 $57,480 Not Implemented
MA0534 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,591 $8,425 Not Implemented
MA0534 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,663 $9,742 Not Implemented
MA0534 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,624 $21,000 Not Implemented
MA0534 # 01 Y:2003 01 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $223,213 $1,257,060 Not Implemented
MA0534 # 04 Y:2003 04 2003 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $20,457 $67,665 Not Implemented
MA0534 # 09 Y:2003 09 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $470 $1,416 Not Implemented
MA0457 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,317 $2,000 Implemented
MA0457 # 04 Y:2000 04 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $9,750 Not Implemented
MA0457 # 01 Y:2000 01 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $113,982 $160,909 Not Implemented
MA0457 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,246 $4,225 Implemented
MA0457 # 02 Y:2000 02 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $55,054 $400,000 Not Implemented
MA0457 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,685 $33,280 Implemented
MA0413 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $572 $1,000 n/a
MA0413 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,342 $53,316 n/a
MA0413 # 02 Y:1998 02 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,782 $800 n/a
MA0413 # 03 Y:1998 03 1998 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,015 $2,000 n/a
MA0408 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,625 $8,625 Not Implemented