Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
159
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0515 # 08 Y:1993 | 08 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,820 | $80,090 | Implemented |
GT0515 # 07 Y:1993 | 07 | 1993 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $8,650 | $6,560 | Not Implemented |
GT0515 # 05 Y:1993 | 05 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,620 | $100,640 | Not Implemented |
GT0515 # 03 Y:1993 | 03 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $680 | $500 | Implemented |
GT0515 # 02 Y:1993 | 02 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,090 | $0 | Not Implemented |
GT0515 # 01 Y:1993 | 01 | 1993 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,130 | $9,570 | Not Implemented |
GT0515 # 06 Y:1993 | 06 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $45,330 | $32,700 | Not Implemented |
GT0515 # 04 Y:1993 | 04 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,260 | $14,500 | Not Implemented |
ME0115 # 05 Y:1993 | 05 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $965 | $100 | Implemented |
ME0115 # 02 Y:1993 | 02 | 1993 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $106,916 | $100,000 | Not Implemented |
ME0115 # 04 Y:1993 | 04 | 1993 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $1,080 | $3,000 | Not Implemented |
ME0115 # 06 Y:1993 | 06 | 1993 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $25,600 | $2,000 | Implemented |
ME0115 # 07 Y:1993 | 07 | 1993 | PAY UTILITY BILLS ON TIME | $3,042 | $0 | Not Implemented |
ME0115 # 03 Y:1993 | 03 | 1993 | OPTIMIZE PLANT POWER FACTOR | $1,882 | $2,500 | Not Implemented |
ME0115 # 01 Y:1993 | 01 | 1993 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,628 | $800 | Not Implemented |
SD0068 # 07 Y:1993 | 07 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,576 | $1,230 | Implemented |
SD0068 # 09 Y:1993 | 09 | 1993 | INSTALL SET-BACK TIMERS | $1,458 | $2,000 | Implemented |
SD0068 # 10 Y:1993 | 10 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,598 | $852 | Implemented |
SD0068 # 04 Y:1993 | 04 | 1993 | INSTALL / REPAIR INSULATION ON STEAM LINES | $149 | $264 | Implemented |
SD0068 # 08 Y:1993 | 08 | 1993 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,560 | $1,470 | Implemented |
SD0068 # 06 Y:1993 | 06 | 1993 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $58,730 | $33,300 | Not Implemented |
SD0068 # 05 Y:1993 | 05 | 1993 | REPAIR AND ELIMINATE STEAM LEAKS | $6,065 | $800 | Implemented |
SD0068 # 03 Y:1993 | 03 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,035 | $140 | Implemented |
SD0068 # 01 Y:1993 | 01 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $731 | $750 | Implemented |
SD0068 # 02 Y:1993 | 02 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,666 | $17,938 | Implemented |